X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274280810000

Well Details

Well ID: 0274280810000
Loading map...
Location: 00/10-08-027-28W4/0
Location Alias: 00/10-08-27-28 W4M
Location Alias 2: 00/10-08-027-28 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 28
Section: 08
County/Municipality: Rocky View County
Well Name: JEFF LAKE ET AL CROSS 10-8-27-28
Operator Name: CNOOC Petroleum North America ULC
License Number: 0028319
License Date: 1965-06-02
License Status: Re-Entered
Spud Date: 1965-06-04
Final Drill Date: 1965-08-10
Well Total Depth: 2649.90 m
Surface Hole Latitude: 51.294113
Surface Hole Longitude: -113.904952

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-06-02 Obtained License
1965-06-30 Drill Stem Test Performed
1965-08-10 Finished Drilling
1965-08-14 Production Casing Operation Performed
1965-09-01 Perforation Treatment Performed - Jet Perforation
1965-09-09 Perforation Treatment Performed - Condensate Squeeze
1965-09-24 Perforation Treatment Performed - Acid Wash - No Pressure
1965-09-25 Perforation Treatment Performed - Acid Wash - No Pressure
1965-09-25 Perforation Treatment Performed - Condensate Squeeze
1965-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-28 Perforation Treatment Performed - Acid Wash - No Pressure
1965-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-10-01 Perforation Treatment Performed - Acid Wash - No Pressure
1965-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-10-08 Perforation Treatment Performed - Condensate Squeeze
1965-10-08 Perforation Treatment Performed - Nitrogen Treatment
1965-12-01 Well Mode changed to Drilled and Cased
1967-05-20 Well Began Production
1967-05-20 Well Fluid changed to Gas
1967-05-20 Well Mode changed to Flowing
1971-05-01 Well Fluid changed to Gas
1971-05-01 Well Mode changed to Suspended
1973-09-05 Perforation Treatment Performed - Cement Squeeze
1973-09-05 Well Abandoned
1973-09-05 Well Fluid changed to Gas
1973-09-05 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-09-01 Perforation 2609.10 2634.70 10
1965-10-01 Acid Treatment 2609.10 2634.70 0
1965-10-08 Nitrogen Treatment 2609.10 2634.70 0
1965-10-08 Acid Treatment 2609.10 2634.70 0
1965-10-08 Condensate Squeeze 2609.10 2634.70 0
1973-09-05 Cement Squeeze 2609.10 2634.70 0
1965-09-09 Condensate Squeeze 2609.10 2634.70 0
1965-09-24 Acid Wash 2609.10 2634.70 0
1965-09-25 Acid Wash 2609.10 2634.70 0
1965-09-25 Condensate Squeeze 2609.10 2634.70 0
1965-09-28 Acid Treatment 2609.10 2634.70 0
1965-09-28 Acid Wash 2609.10 2634.70 0
1965-09-29 Acid Treatment 2609.10 2634.70 0
1965-10-01 Acid Wash 2609.10 2634.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 265 0.0 0.0 0.0
1969 7714 0.0 0.0 0.0
1970 7202 0.0 0.0 0.0
1971 2271 0.0 0.0 0.0

For data sources see[5]

References