X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274280904000

Well Details

Well ID: 0274280904000
Loading map...
Location: 00/04-09-027-28W4/0
Location Alias: 00/04-09-27-28 W4M
Location Alias 2: 00/04-09-027-28 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 28
Section: 09
County/Municipality: Rocky View County
Well Name: EMBER CROSS 4-9-27-28
Operator Name: Ember Resources Inc.
License Number: 0409897
License Date: 2009-03-26
License Status: Amended
Spud Date: 2009-12-02
Final Drill Date: 2009-12-04
Well Total Depth: 1577.20 m
Surface Hole Latitude: 51.291511
Surface Hole Longitude: -113.879499

For data sources see[1][2]

Well History

Date Event
2009-03-26 Obtained License
2009-12-02 Direction Drilling Operation Performed - Deviate
2009-12-02 Surface Casing Operation Performed
2009-12-04 Finished Drilling
2009-12-04 Well Mode changed to Drilled and Cased
2009-12-06 Production Casing Operation Performed
2009-12-06 Rig Released
2009-12-11 Well Log Performed
2010-01-22 Perforation Treatment Performed - Jet Perforation
2010-02-15 Perforation Treatment Performed - Jet Perforation
2010-02-23 Perforation Treatment Performed - Fractured
2010-03-12 Well Began Production
2010-03-12 Well Fluid changed to Coalbed Methane-Coals and Other
2010-03-12 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-02 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-22 Perforation 921.00 924.00 13
2010-02-15 Perforation 952.70 953.70 13
2010-02-15 Perforation 690.60 691.10 13
2010-02-15 Perforation 846.00 848.00 13
2010-02-15 Perforation 822.00 824.00 13
2010-02-15 Perforation 698.00 701.00 13
2010-02-15 Perforation 1110.00 1112.00 13
2010-02-15 Perforation 621.30 622.30 13
2010-02-15 Perforation 619.30 619.80 13
2010-02-15 Perforation 608.00 608.50 13
2010-02-15 Perforation 1146.60 1147.10 13
2010-01-22 Perforation 1397.00 1398.00 13
2010-02-15 Perforation 1129.00 1130.00 13
2010-02-15 Perforation 1123.50 1124.50 13
2010-02-15 Perforation 1147.90 1148.90 13
2010-02-15 Perforation 1172.50 1173.00 13
2010-02-15 Perforation 1152.60 1153.10 13
2010-02-15 Perforation 1149.80 1151.80 13
2010-02-15 Perforation 1118.90 1119.90 13
2010-02-15 Perforation 1037.60 1038.10 13
2010-02-15 Perforation 1053.70 1054.70 13
2010-02-15 Perforation 1008.40 1008.90 13
2010-01-22 Perforation 1486.00 1488.00 13
2010-02-15 Perforation 1034.50 1035.00 13
2010-02-15 Perforation 1097.00 1097.50 13
2010-02-15 Perforation 1075.30 1077.30 13
2010-02-15 Perforation 1085.90 1086.40 13
2010-02-23 Fracture 698.00 1112.00 0
2010-02-23 Fracture 608.00 1173.00 0
2010-02-15 Perforation 942.20 942.70 13
2010-02-15 Perforation 858.00 858.50 13
2010-02-15 Perforation 778.40 778.90 13
2010-02-15 Perforation 947.40 947.90 13
2010-02-15 Perforation 960.90 961.40 13
2010-02-15 Perforation 956.10 957.10 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7064 0.0 0.0 0.0
2011 8755 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8740 0.0 0.0 0.0
2015 8724 0.0 0.0 0.0
2016 8690 0.0 0.0 0.0
2017 8690 0.0 0.0 0.0
2018 8622 0.0 0.0 0.0
2019 8540 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[6]

References