If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274282614000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.342421,"lon":-113.84063,"icon":""}]} |
| Location: 00/14-26-027-28W4/0 | |
| Location Alias: 00/14-26-27-28 W4M | |
| Location Alias 2: 00/14-26-027-28 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 28 | |
| Section: 26 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER CROSS 14-26-27-28 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0410984 | |
| License Date: 2009-06-17 | |
| License Status: Suspension | |
| Spud Date: 2009-09-17 | |
| Final Drill Date: 2009-09-22 | |
| Well Total Depth: 1213.00 m | |
| Surface Hole Latitude: 51.342421 | |
| Surface Hole Longitude: -113.840630 |
| Date | Event |
|---|---|
| 2009-06-17 | Obtained License |
| 2009-09-18 | Surface Casing Operation Performed |
| 2009-09-22 | Finished Drilling |
| 2009-09-22 | Production Casing Operation Performed |
| 2009-09-22 | Rig Released |
| 2009-09-22 | Well Mode changed to Drilled and Cased |
| 2009-09-29 | Well Log Performed |
| 2009-11-15 | Perforation Treatment Performed - Jet Perforation |
| 2009-11-28 | Perforation Treatment Performed - Jet Perforation |
| 2009-12-02 | Perforation Treatment Performed - Fractured |
| 2009-12-21 | Well Began Production |
| 2009-12-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2009-12-21 | Well Mode changed to Flowing |
| 2017-06-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2017-06-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-11-15 | Perforation | 1040.00 | 1042.00 | 13 |
| 2009-11-28 | Perforation | 513.00 | 514.00 | 13 |
| 2009-11-28 | Perforation | 418.00 | 421.00 | 13 |
| 2009-11-28 | Perforation | 709.00 | 712.00 | 13 |
| 2009-11-28 | Perforation | 676.00 | 679.00 | 13 |
| 2009-11-28 | Perforation | 639.00 | 643.00 | 13 |
| 2009-11-28 | Perforation | 564.60 | 565.60 | 13 |
| 2009-11-28 | Perforation | 831.00 | 831.50 | 13 |
| 2009-11-28 | Perforation | 822.30 | 822.80 | 13 |
| 2009-11-28 | Perforation | 820.10 | 820.60 | 13 |
| 2009-11-28 | Perforation | 840.50 | 841.00 | 13 |
| 2009-11-28 | Perforation | 436.30 | 436.80 | 13 |
| 2009-11-28 | Perforation | 857.50 | 858.00 | 13 |
| 2009-11-28 | Perforation | 844.90 | 845.40 | 13 |
| 2009-11-28 | Perforation | 841.60 | 842.10 | 13 |
| 2009-11-28 | Perforation | 787.60 | 789.60 | 13 |
| 2009-11-28 | Perforation | 772.30 | 772.80 | 13 |
| 2009-11-28 | Perforation | 760.20 | 760.70 | 13 |
| 2009-11-28 | Perforation | 702.10 | 702.60 | 13 |
| 2009-11-28 | Perforation | 817.70 | 818.20 | 13 |
| 2009-11-28 | Perforation | 796.20 | 796.70 | 13 |
| 2009-12-02 | Fracture | 609.00 | 611.00 | 0 |
| 2009-11-28 | Perforation | 424.10 | 424.60 | 13 |
| 2009-12-02 | Fracture | 639.00 | 643.00 | 0 |
| 2009-12-02 | Fracture | 418.00 | 421.00 | 0 |
| 2009-12-02 | Fracture | 513.00 | 514.00 | 0 |
| 2009-12-02 | Fracture | 717.00 | 718.00 | 0 |
| 2009-12-02 | Fracture | 397.90 | 858.00 | 0 |
| 2009-12-02 | Fracture | 676.00 | 679.00 | 0 |
| 2009-12-02 | Fracture | 709.00 | 712.00 | 0 |
| 2009-11-28 | Perforation | 397.90 | 398.40 | 13 |
| 2009-11-28 | Perforation | 480.80 | 481.30 | 13 |
| 2009-11-28 | Perforation | 442.50 | 443.00 | 13 |
| 2009-11-28 | Perforation | 437.90 | 438.40 | 13 |
| 2009-11-28 | Perforation | 717.00 | 718.00 | 13 |
| 2009-11-28 | Perforation | 609.00 | 611.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 264 | 0.0 | 0.0 | 0.0 |
| 2010 | 8681 | 0.0 | 0.0 | 0.0 |
| 2011 | 8496 | 0.0 | 0.0 | 0.0 |
| 2012 | 8691 | 0.0 | 0.0 | 0.0 |
| 2013 | 7923 | 0.0 | 0.0 | 0.0 |
| 2014 | 357 | 0.0 | 0.0 | 0.0 |
For data sources see[5]