If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274282616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.342345,"lon":-113.827224,"icon":""}]} |
Location: 00/16-26-027-28W4/0 | |
Location Alias: 00/16-26-27-28 W4M | |
Location Alias 2: 00/16-26-027-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 28 | |
Section: 26 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSS 16-26-27-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410544 | |
License Date: 2009-05-22 | |
License Status: Issued | |
Spud Date: 2009-09-15 | |
Final Drill Date: 2009-09-23 | |
Well Total Depth: 1208.00 m | |
Surface Hole Latitude: 51.342345 | |
Surface Hole Longitude: -113.827224 |
Date | Event |
---|---|
2009-05-22 | Obtained License |
2009-09-15 | Surface Casing Operation Performed |
2009-09-23 | Finished Drilling |
2009-09-23 | Well Mode changed to Drilled and Cased |
2009-09-24 | Production Casing Operation Performed |
2009-09-24 | Rig Released |
2009-10-02 | Well Log Performed |
2009-11-24 | Perforation Treatment Performed - Jet Perforation |
2009-12-10 | Well Fluid changed to Gas |
2009-12-10 | Well Mode changed to Testing |
2009-12-21 | Perforation Treatment Performed - Jet Perforation |
2010-01-27 | Perforation Treatment Performed - Fractured |
2010-01-28 | Perforation Treatment Performed - Fractured |
2010-02-08 | Well Began Production |
2010-02-08 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-08 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-11-24 | Perforation | 1008.00 | 1009.00 | 13 |
2009-12-21 | Perforation | 751.90 | 752.40 | 13 |
2009-12-21 | Perforation | 619.90 | 620.40 | 13 |
2009-12-21 | Perforation | 562.50 | 563.00 | 13 |
2009-12-21 | Perforation | 657.00 | 659.00 | 13 |
2009-12-21 | Perforation | 462.00 | 464.00 | 13 |
2009-12-21 | Perforation | 455.00 | 457.00 | 13 |
2009-12-21 | Perforation | 445.00 | 447.00 | 13 |
2009-12-21 | Perforation | 651.00 | 654.00 | 13 |
2009-12-21 | Perforation | 589.00 | 592.00 | 13 |
2009-12-21 | Perforation | 485.00 | 488.00 | 13 |
2009-11-24 | Perforation | 1002.00 | 1004.00 | 13 |
2009-12-21 | Perforation | 826.00 | 826.50 | 13 |
2009-12-21 | Perforation | 818.30 | 818.80 | 13 |
2009-12-21 | Perforation | 816.40 | 816.90 | 13 |
2009-12-21 | Perforation | 853.60 | 854.10 | 13 |
2009-12-21 | Perforation | 841.70 | 842.20 | 13 |
2009-12-21 | Perforation | 836.20 | 836.70 | 13 |
2009-12-21 | Perforation | 787.10 | 789.10 | 13 |
2009-12-21 | Perforation | 756.20 | 756.70 | 13 |
2009-12-21 | Perforation | 796.20 | 796.70 | 13 |
2009-12-21 | Perforation | 770.30 | 770.80 | 13 |
2009-11-24 | Perforation | 681.00 | 685.00 | 13 |
2009-12-21 | Perforation | 814.30 | 814.80 | 13 |
2010-01-27 | Fracture | 1008.00 | 1009.00 | 0 |
2010-01-27 | Fracture | 1028.00 | 1030.00 | 0 |
2010-01-28 | Fracture | 445.00 | 775.00 | 0 |
2010-01-28 | Fracture | 479.80 | 854.10 | 0 |
2009-11-24 | Perforation | 1157.00 | 1159.00 | 13 |
2009-11-24 | Perforation | 1070.00 | 1072.00 | 13 |
2009-11-24 | Perforation | 1028.00 | 1030.00 | 13 |
2009-12-21 | Perforation | 534.90 | 535.40 | 13 |
2009-12-21 | Perforation | 479.80 | 480.30 | 13 |
2009-12-21 | Perforation | 773.00 | 775.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 72 | 0.0 | 0.0 | 0.0 |
2010 | 7667 | 0.0 | 0.0 | 0.0 |
2011 | 8180 | 0.0 | 0.0 | 0.0 |
2012 | 8544 | 0.0 | 0.0 | 0.0 |
2013 | 8676 | 0.0 | 0.0 | 0.0 |
2014 | 8440 | 0.0 | 0.0 | 0.0 |
2015 | 8194 | 0.0 | 0.0 | 0.0 |
2016 | 8249 | 0.0 | 0.0 | 0.0 |
2017 | 8562 | 0.0 | 0.0 | 0.0 |
2018 | 8685 | 0.0 | 0.0 | 0.0 |
2019 | 8587 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[5]