X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274283406000

Well Details

Well ID: 0274283406000
Loading map...
Location: 00/06-34-027-28W4/0
Location Alias: 00/06-34-27-28 W4M
Location Alias 2: 00/06-34-027-28 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 28
Section: 34
County/Municipality: Rocky View County
Well Name: HARVEST HZ CROSSE 6-34-27-28
Operator Name: Harvest Operations Corp.
License Number: 0426079
License Date: 2010-11-19
License Status: Suspension
Spud Date: 2011-01-16
Final Drill Date: 2011-02-13
Well Total Depth: 3205.00 m
Surface Hole Latitude: 51.357144
Surface Hole Longitude: -113.871837

For data sources see[1][2]

Well History

Date Event
2010-11-19 Obtained License
2011-01-17 Surface Casing Operation Performed
2011-01-21 Well Log Performed
2011-01-22 Direction Drilling Operation Performed - Horizontal
2011-02-13 Finished Drilling
2011-02-13 Well Log Performed
2011-02-13 Well Mode changed to Drilled and Cased
2011-02-14 Production Casing Operation Performed
2011-02-15 Rig Released
2011-02-22 Well Log Performed
2011-02-25 Perforation Treatment Performed - Jet Perforation
2011-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-12 Well Began Production
2011-08-12 Well Fluid changed to Crude Oil
2011-08-12 Well Mode changed to Pumping
2019-10-01 Well Fluid changed to Crude Oil
2019-10-01 Well Mode changed to Suspended
2019-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-22 Plug Back Performed
2019-10-22 Well Fluid changed to Crude Oil
2019-10-22 Well Mode changed to Abandoned Zone
2019-10-26 Perforation Treatment Performed - Jet Perforation
2019-10-27 Perforation Treatment Performed - Cement Squeeze
2019-10-28 Perforation Treatment Performed - Cement Plug
2019-10-28 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-22 1860.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-25 Perforation 3176.00 3177.00 17
2011-03-13 Multi-Stage Fracture 2217.00 2217.10 0
2019-10-22 Packing Device Capped w/Cement 2116.00 2140.00 0
2019-10-26 Perforation 450.00 460.00 8
2019-10-27 Cement Squeeze 450.00 460.00 0
2019-10-28 Cement Plug 408.40 476.00 0
2011-02-27 Multi-Stage Fracture 3113.00 3113.10 0
2011-02-27 Multi-Stage Fracture 3067.00 3067.10 0
2011-03-11 Multi-Stage Fracture 2947.00 2947.10 0
2011-03-11 Multi-Stage Fracture 2825.00 2825.10 0
2011-03-12 Multi-Stage Fracture 2703.00 2703.10 0
2011-03-12 Multi-Stage Fracture 2582.00 2582.10 0
2011-03-12 Multi-Stage Fracture 2460.00 2460.10 0
2011-03-13 Multi-Stage Fracture 2339.00 2339.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 72 0.0 0.0 0.0
2012 6383 0.0 0.0 0.0
2013 7463 0.0 0.0 0.0
2014 8147 0.0 0.0 0.0
2015 8005 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8343 0.0 0.0 0.0
2018 5567 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References