If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0275012101000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.316485,"lon":-114.072897,"icon":""}]} |
| Location: 00/01-21-027-01W5/0 | |
| Location Alias: 00/01-21-27-01 W5M | |
| Location Alias 2: 00/01-21-027-01 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 5 | |
| Range: 01 | |
| Section: 21 | |
| County/Municipality: Rocky View County | |
| Well Name: CNRL HLCR CROSSE 1-21-27-1 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0167661 | |
| License Date: 1994-06-03 | |
| License Status: RecCertified | |
| Spud Date: 1994-06-15 | |
| Final Drill Date: 1994-06-30 | |
| Well Total Depth: 2430.00 m | |
| Surface Hole Latitude: 51.316485 | |
| Surface Hole Longitude: -114.072897 |
| Date | Event |
|---|---|
| 1994-06-03 | Obtained License |
| 1994-06-17 | Production Casing Operation Performed |
| 1994-06-29 | Drill Stem Test Performed |
| 1994-06-30 | Finished Drilling |
| 1994-07-01 | Well Log Performed |
| 1994-07-03 | Drill Stem Test Performed |
| 1994-07-03 | Perforation Treatment Performed - Open-Hole Completion |
| 1994-07-03 | Plug Back Performed |
| 1994-07-04 | Well Log Performed |
| 1994-07-05 | Rig Released |
| 1995-07-31 | Perforation Treatment Performed - Cement Plug |
| 1995-07-31 | Plug Back Performed |
| 1995-07-31 | Well Log Performed |
| 1995-08-01 | Perforation Treatment Performed - Cement Plug |
| 1995-08-01 | Plug Back Performed |
| 1995-08-01 | Well Abandoned |
| 1995-08-01 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-07-03 | Open Hole/Barefoot Completion | 384.00 | 1738.00 | 0 |
| 1995-07-31 | Cement Plug | 1335.00 | 1500.00 | 0 |
| 1995-07-31 | Cement Plug | 1170.00 | 1335.00 | 0 |
| 1995-08-01 | Cement Plug | 472.00 | 580.00 | 0 |
| 1995-08-01 | Cement Plug | 276.00 | 472.00 | 0 |
For data sources see[4]