If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0275021603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.300847,"lon":-114.221656,"icon":""}]} |
Location: 00/03-16-027-02W5/0 | |
Location Alias: 00/03-16-27-02 W5M | |
Location Alias 2: 00/03-16-027-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 5 | |
Range: 02 | |
Section: 16 | |
County/Municipality: Rocky View County | |
Well Name: ASAMERA ET AL CROSSFIELD 3-16-27-2 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0126632 | |
License Date: 1987-05-28 | |
License Status: RecCertified | |
Spud Date: 1987-06-03 | |
Final Drill Date: 1987-07-05 | |
Well Total Depth: 2692.00 m | |
Surface Hole Latitude: 51.300847 | |
Surface Hole Longitude: -114.221656 |
Date | Event |
---|---|
1987-05-28 | Obtained License |
1987-06-03 | Lost Circulation Occurred |
1987-06-04 | Surface Casing Operation Performed |
1987-06-12 | Direction Drilling Operation Performed - Deviate |
1987-07-03 | Drill Stem Test Performed |
1987-07-05 | Finished Drilling |
1987-07-06 | Well Log Performed |
1987-07-07 | Drill Stem Test Performed |
1987-07-07 | Well Log Performed |
1987-07-09 | Production Casing Operation Performed |
1987-07-10 | Rig Released |
1987-07-17 | Perforation Treatment Performed - Jet Perforation |
1987-07-17 | Well Log Performed |
1987-07-19 | Perforation Treatment Performed - Acid Wash - No Pressure |
1987-07-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-07-23 | Perforation Treatment Performed - Jet Perforation |
1987-07-24 | Perforation Treatment Performed - Jet Perforation |
1987-07-25 | Perforation Treatment Performed - Cement Squeeze |
1987-08-02 | Perforation Treatment Performed - Jet Perforation |
1987-08-02 | Well Log Performed |
1987-08-06 | Well Log Performed |
1987-08-07 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1987-08-09 | Perforation Treatment Performed - Acid Wash - No Pressure |
1987-08-09 | Well Log Performed |
1987-08-15 | Well Log Performed |
1987-08-16 | Perforation Treatment Performed - Cement Squeeze |
1987-08-19 | Perforation Treatment Performed - Jet Perforation |
1987-08-19 | Well Log Performed |
1987-08-20 | Perforation Treatment Performed - Acid Wash - No Pressure |
1987-08-24 | Perforation Treatment Performed - Cement Squeeze |
1987-08-24 | Plug Back Performed |
1987-08-25 | Perforation Treatment Performed - Jet Perforation |
1987-08-27 | Perforation Treatment Performed - Acid Wash - No Pressure |
1987-09-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-09-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-09-05 | Plug Back Performed |
1987-09-05 | Well Log Performed |
1987-09-05 | Well Mode changed to Abandoned |
1987-09-06 | Well Abandoned |
1988-07-07 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1987-06-12 | 1800.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-07-17 | Perforation | 2640.00 | 2643.50 | 13 |
1987-08-16 | Cement Squeeze | 2648.00 | 2650.00 | 0 |
1987-08-19 | Perforation | 2641.00 | 2644.00 | 13 |
1987-08-20 | Acid Wash | 2641.00 | 2644.00 | 0 |
1987-08-24 | Cement Squeeze | 2641.00 | 2644.00 | 0 |
1987-08-25 | Perforation | 2630.00 | 2634.20 | 13 |
1987-08-27 | Acid Wash | 2630.00 | 2634.20 | 0 |
1987-09-03 | Acid Treatment | 2630.00 | 2634.20 | 0 |
1987-09-05 | Packing Device Capped w/Cement | 2620.00 | 2620.00 | 0 |
1987-07-19 | Acid Wash | 2640.00 | 2643.50 | 0 |
1987-07-20 | Acid Treatment | 2640.00 | 2643.50 | 0 |
1987-07-23 | Perforation | 2648.00 | 2650.50 | 13 |
1987-07-24 | Perforation | 2653.00 | 2655.00 | 13 |
1987-07-25 | Cement Squeeze | 2640.00 | 2655.00 | 0 |
1987-08-02 | Perforation | 2648.00 | 2650.00 | 13 |
1987-08-07 | Hydra Jet Perforation | 2648.00 | 2650.00 | 0 |
1987-08-09 | Acid Wash | 2648.00 | 2650.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1987-06-03 | Lost Circulation | 102.00 | 102.00 |
For data sources see[6]