X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275023506000

Well Details

Well ID: 0275023506000
Loading map...
Location: 00/06-35-027-02W5/0
Location Alias: 00/06-35-27-02 W5M
Location Alias 2: 00/06-35-027-02 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 02
Section: 35
County/Municipality: Rocky View County
Well Name: Canlin CROSS 6-35-27-2
Operator Name: Bighorn Energy Corporation
License Number: 0019900
License Date: 1960-10-27
License Status: Issued
Spud Date: 1960-11-19
Final Drill Date: 1960-12-31
Well Total Depth: 2627.40 m
Surface Hole Latitude: 51.349243
Surface Hole Longitude: -114.180418

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-10-27 Obtained License
1960-12-31 Finished Drilling
1960-12-31 Well Mode changed to Drilled and Cased
1961-01-02 Production Casing Operation Performed
1961-02-24 Perforation Treatment Performed - Acid Wash - No Pressure
1961-02-24 Perforation Treatment Performed - Jet Perforation
1961-02-26 Perforation Treatment Performed - Fractured
1961-03-09 Well Began Production
1961-03-09 Well Fluid changed to Crude Oil
1961-03-09 Well Mode changed to Flowing
1961-12-15 Perforation Treatment Performed - Cement Squeeze
1961-12-15 Well Fluid changed to Crude Oil
1961-12-15 Well Mode changed to Abandoned Zone
1970-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-09 Perforation Treatment Performed - Jet Perforation
2010-06-20 Perforation Treatment Performed - Jet Perforation
2010-06-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-02-24 Perforation 2054.00 2056.20 7
2010-06-20 Perforation 2578.50 2582.00 20
1961-02-24 Acid Wash 2054.00 2056.20 0
1961-02-26 Fracture 2054.00 2056.20 0
1961-12-15 Cement Squeeze 2054.00 2056.20 0
1970-09-25 Acid Treatment 2054.00 2056.20 0
1970-10-09 Perforation 2576.50 2587.10 7
1970-10-09 Perforation 2589.60 2594.50 7
2010-06-20 Perforation 2590.00 2592.50 20
2010-06-20 Perforation 2584.00 2586.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References