If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0275030110000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.26997,"lon":-114.29144,"icon":""}]} |
Location: 00/10-01-027-03W5/0 | |
Location Alias: 00/10-01-27-03 W5M | |
Location Alias 2: 00/10-01-027-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 5 | |
Range: 03 | |
Section: 01 | |
County/Municipality: Rocky View County | |
Well Name: TRIOIL ET AL HZ LOCHEND 10-1-27-3 | |
Operator Name: ORLEN Upstream Canada Ltd. | |
License Number: 0434579 | |
License Date: 2011-06-23 | |
License Status: Suspension | |
Spud Date: 2011-08-01 | |
Final Drill Date: 2011-08-23 | |
Well Total Depth: 3321.00 m | |
Surface Hole Latitude: 51.269970 | |
Surface Hole Longitude: -114.291440 |
Date | Event |
---|---|
2011-06-23 | Obtained License |
2011-08-03 | Surface Casing Operation Performed |
2011-08-07 | Direction Drilling Operation Performed - Horizontal |
2011-08-15 | Intermediate Casing Operation Performed |
2011-08-23 | Finished Drilling |
2011-08-23 | Well Mode changed to Drilled and Cased |
2011-08-30 | Liner Casing Operation Performed |
2011-08-30 | Perforation Treatment Performed - Open-Hole Completion |
2011-08-31 | Rig Released |
2011-09-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-01 | Well Began Production |
2011-10-01 | Well Fluid changed to Crude Oil |
2011-10-01 | Well Mode changed to Flowing |
2016-09-01 | Well Fluid changed to Crude Oil |
2016-09-01 | Well Mode changed to Pumping |
2017-09-01 | Well Fluid changed to Crude Oil |
2017-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-07 | 1830.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-30 | Open Hole/Barefoot Completion | 3261.00 | 3321.00 | 0 |
2011-09-14 | Multi-Stage Fracture | 2645.80 | 2645.90 | 0 |
2011-09-14 | Multi-Stage Fracture | 2571.60 | 2571.70 | 0 |
2011-09-14 | Multi-Stage Fracture | 2497.00 | 2497.10 | 0 |
2011-09-14 | Multi-Stage Fracture | 2423.00 | 2423.10 | 0 |
2011-09-14 | Multi-Stage Fracture | 2348.60 | 2348.70 | 0 |
2011-09-13 | Multi-Stage Fracture | 3240.20 | 3240.30 | 0 |
2011-09-13 | Multi-Stage Fracture | 3175.40 | 3175.50 | 0 |
2011-09-13 | Multi-Stage Fracture | 3101.60 | 3101.70 | 0 |
2011-09-13 | Multi-Stage Fracture | 3027.90 | 3028.00 | 0 |
2011-09-13 | Multi-Stage Fracture | 2942.60 | 2942.70 | 0 |
2011-09-13 | Multi-Stage Fracture | 2868.30 | 2868.40 | 0 |
2011-09-13 | Multi-Stage Fracture | 2794.40 | 2794.50 | 0 |
2011-09-13 | Multi-Stage Fracture | 2719.90 | 2720.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2083 | 0.0 | 0.0 | 0.0 |
2012 | 8490 | 0.0 | 0.0 | 0.0 |
2013 | 8570 | 0.0 | 0.0 | 0.0 |
2014 | 8663 | 0.0 | 0.0 | 0.0 |
2015 | 8606 | 0.0 | 0.0 | 0.0 |
2016 | 4050 | 0.0 | 0.0 | 0.0 |
For data sources see[6]