X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275030113000

Well Details

Well ID: 0275030113000
Loading map...
Location: 00/13-01-027-03W5/0
Location Alias: 00/13-01-27-03 W5M
Location Alias 2: 00/13-01-027-03 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 03
Section: 01
County/Municipality: Rocky View County
Well Name: NAL LOCHEND 13-1-27-3
Operator Name: NAL Resources Limited
License Number: 0422687
License Date: 2010-08-16
License Status: Issued
Spud Date: 2010-09-25
Final Drill Date: 2010-10-29
Well Total Depth: 3474.00 m
Surface Hole Latitude: 51.269910
Surface Hole Longitude: -114.302463

For data sources see[1][2]

Well History

Date Event
2010-08-16 Obtained License
2010-09-29 Surface Casing Operation Performed
2010-10-01 Well Log Performed
2010-10-02 Direction Drilling Operation Performed - Horizontal
2010-10-02 Well Log Performed
2010-10-13 Intermediate Casing Operation Performed
2010-10-26 Well Log Performed
2010-10-29 Finished Drilling
2010-10-29 Liner Casing Operation Performed
2010-10-29 Perforation Treatment Performed - Open-Hole Completion
2010-10-29 Rig Released
2010-10-29 Well Mode changed to Drilled and Cased
2010-11-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-01 Well Began Production
2011-03-01 Well Fluid changed to Crude Oil
2011-03-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-02 1931.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-29 Open Hole/Barefoot Completion 2375.00 3474.00 0
2010-11-09 Multi-Stage Fracture 2684.40 2684.50 0
2010-11-09 Multi-Stage Fracture 2583.40 2583.50 0
2010-11-09 Multi-Stage Fracture 2484.80 2484.90 0
2010-11-09 Multi-Stage Fracture 3459.70 3459.80 0
2010-11-09 Multi-Stage Fracture 3367.70 3367.80 0
2010-11-09 Multi-Stage Fracture 3272.30 3272.40 0
2010-11-09 Multi-Stage Fracture 3170.50 3170.60 0
2010-11-09 Multi-Stage Fracture 3071.50 3071.60 0
2010-11-09 Multi-Stage Fracture 2974.60 2974.70 0
2010-11-09 Multi-Stage Fracture 2877.00 2877.10 0
2010-11-09 Multi-Stage Fracture 2785.00 2785.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6611 0.0 0.0 0.0
2012 7413 0.0 0.0 0.0
2013 8622 0.0 0.0 0.0
2014 8285 0.0 0.0 0.0
2015 7325 0.0 0.0 0.0
2016 8778 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8547 0.0 0.0 0.0
2019 8539 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References