X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275030502000

Well Details

Well ID: 0275030502000
Loading map...
Location: 00/02-05-027-03W5/0
Location Alias: 00/02-05-27-03 W5M
Location Alias 2: 00/02-05-027-03 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 03
Section: 05
County/Municipality: Rocky View County
Well Name: RIDGEBACK LOCHEND 2-5-27-3
Operator Name: Ridgeback Resources Inc.
License Number: 0431672
License Date: 2011-02-17
License Status: Amended
Spud Date: 2011-03-10
Final Drill Date: 2011-03-26
Well Total Depth: 3942.00 m
Surface Hole Latitude: 51.288209
Surface Hole Longitude: -114.382490

For data sources see[1][2]

Well History

Date Event
2011-02-17 Obtained License
2011-03-10 Lost Circulation Occurred
2011-03-17 Surface Casing Operation Performed
2011-03-19 Direction Drilling Operation Performed - Horizontal
2011-03-20 Well Log Performed
2011-03-26 Finished Drilling
2011-03-26 Well Log Performed
2011-03-26 Well Mode changed to Drilled and Cased
2011-03-28 Production Casing Operation Performed
2011-03-28 Well Log Performed
2011-03-30 Perforation Treatment Performed - Open-Hole Completion
2011-03-30 Rig Released
2011-04-04 Well Log Performed
2011-07-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-07-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-07-16 Well Began Production
2011-07-16 Well Fluid changed to Crude Oil
2011-07-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-19 1880.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-30 Open Hole/Barefoot Completion 3878.00 3942.00 0
2011-07-14 Multi-Stage Fracture 3310.70 3310.80 0
2011-07-14 Multi-Stage Fracture 3238.60 3238.70 0
2011-07-14 Multi-Stage Fracture 3167.20 3167.30 0
2011-07-14 Multi-Stage Fracture 3094.80 3094.90 0
2011-07-15 Multi-Stage Fracture 3034.90 3035.00 0
2011-07-15 Multi-Stage Fracture 2961.70 2961.80 0
2011-07-15 Multi-Stage Fracture 2902.80 2902.90 0
2011-07-15 Multi-Stage Fracture 2831.90 2832.00 0
2011-07-15 Multi-Stage Fracture 2758.10 2758.20 0
2011-07-15 Multi-Stage Fracture 2697.30 2697.40 0
2011-07-14 Multi-Stage Fracture 3840.70 3840.80 0
2011-07-15 Multi-Stage Fracture 2624.30 2624.40 0
2011-07-15 Multi-Stage Fracture 2551.70 2551.80 0
2011-07-14 Multi-Stage Fracture 3775.80 3775.90 0
2011-07-14 Multi-Stage Fracture 3720.00 3720.10 0
2011-07-14 Multi-Stage Fracture 3648.40 3648.50 0
2011-07-14 Multi-Stage Fracture 3575.80 3575.90 0
2011-07-14 Multi-Stage Fracture 3515.20 3515.30 0
2011-07-14 Multi-Stage Fracture 3444.10 3444.20 0
2011-07-14 Multi-Stage Fracture 3370.30 3370.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3556 0.0 0.0 0.0
2012 7546 0.0 0.0 0.0
2013 6204 0.0 0.0 0.0
2014 6755 0.0 0.0 0.0
2015 8556 0.0 0.0 0.0
2016 8768 0.0 0.0 0.0
2017 8713 0.0 0.0 0.0
2018 8637 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2016 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-03-10 Lost Circulation 58.00 80.00

For data sources see[7]

References