If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0275030803000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.303056,"lon":-114.393989,"icon":""}]} |
Location: 00/03-08-027-03W5/0 | |
Location Alias: 00/03-08-27-03 W5M | |
Location Alias 2: 00/03-08-027-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 5 | |
Range: 03 | |
Section: 08 | |
County/Municipality: Rocky View County | |
Well Name: RIDGEBACK LOCHEND 3-8-27-3 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0448473 | |
License Date: 2012-09-14 | |
License Status: Issued | |
Spud Date: 2012-09-24 | |
Final Drill Date: 2012-10-07 | |
Well Total Depth: 3883.00 m | |
Surface Hole Latitude: 51.303056 | |
Surface Hole Longitude: -114.393989 |
Date | Event |
---|---|
2012-09-14 | Obtained License |
2012-09-27 | Surface Casing Operation Performed |
2012-09-30 | Direction Drilling Operation Performed - Deviate |
2012-10-01 | Direction Drilling Operation Performed - Horizontal |
2012-10-07 | Finished Drilling |
2012-10-07 | Well Log Performed |
2012-10-07 | Well Mode changed to Drilled and Cased |
2012-10-11 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-11 | Production Casing Operation Performed |
2012-10-11 | Rig Released |
2012-10-15 | Well Log Performed |
2012-11-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-04 | Well Began Production |
2012-11-04 | Well Fluid changed to Crude Oil |
2012-11-04 | Well Mode changed to Flowing |
2012-11-07 | Well Log Performed |
2012-11-24 | Well Fluid changed to Crude Oil |
2012-11-24 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-24 | Precision Drilling Corporation | 379 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-30 | 1909.10 | Deviate (5 - 79 degrees) |
2012-10-01 | 2470.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-11 | Open Hole/Barefoot Completion | 3878.00 | 3883.00 | 0 |
2012-11-02 | Multi-Stage Fracture | 3308.20 | 3308.30 | 0 |
2012-11-02 | Multi-Stage Fracture | 3247.00 | 3247.10 | 0 |
2012-11-02 | Multi-Stage Fracture | 3173.10 | 3173.20 | 0 |
2012-11-02 | Multi-Stage Fracture | 3113.70 | 3113.80 | 0 |
2012-11-02 | Multi-Stage Fracture | 3040.60 | 3040.70 | 0 |
2012-11-02 | Multi-Stage Fracture | 2969.70 | 2969.80 | 0 |
2012-11-02 | Multi-Stage Fracture | 2895.90 | 2896.00 | 0 |
2012-11-02 | Multi-Stage Fracture | 2837.60 | 2837.70 | 0 |
2012-11-02 | Multi-Stage Fracture | 2768.50 | 2768.60 | 0 |
2012-11-02 | Multi-Stage Fracture | 2694.80 | 2694.90 | 0 |
2012-11-02 | Multi-Stage Fracture | 3852.70 | 3852.80 | 0 |
2012-11-02 | Multi-Stage Fracture | 2635.80 | 2635.90 | 0 |
2012-11-02 | Multi-Stage Fracture | 2562.50 | 2562.60 | 0 |
2012-11-02 | Multi-Stage Fracture | 3788.00 | 3788.10 | 0 |
2012-11-02 | Multi-Stage Fracture | 3715.80 | 3715.90 | 0 |
2012-11-02 | Multi-Stage Fracture | 3655.50 | 3655.60 | 0 |
2012-11-02 | Multi-Stage Fracture | 3585.90 | 3586.00 | 0 |
2012-11-02 | Multi-Stage Fracture | 3512.00 | 3512.10 | 0 |
2012-11-02 | Multi-Stage Fracture | 3440.90 | 3441.00 | 0 |
2012-11-02 | Multi-Stage Fracture | 3382.20 | 3382.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 835 | 0.0 | 0.0 | 0.0 |
2013 | 6982 | 0.0 | 0.0 | 0.0 |
2014 | 7291 | 0.0 | 0.0 | 0.0 |
2015 | 8539 | 0.0 | 0.0 | 0.0 |
2016 | 8616 | 0.0 | 0.0 | 0.0 |
2017 | 8713 | 0.0 | 0.0 | 0.0 |
2018 | 4965 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-11 | No Incident Encountered | 0.00 | 0.00 |
2012-11-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]