X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275030804000

Well Details

Well ID: 0275030804000
Loading map...
Location: 00/04-08-027-03W5/0
Location Alias: 00/04-08-27-03 W5M
Location Alias 2: 00/04-08-027-03 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 03
Section: 08
County/Municipality: Rocky View County
Well Name: RIDGEBACK LOCHEND 4-8-27-3
Operator Name: Ridgeback Resources Inc.
License Number: 0433059
License Date: 2011-04-20
License Status: Issued
Spud Date: 2011-09-07
Final Drill Date: 2011-09-21
Well Total Depth: 3879.00 m
Surface Hole Latitude: 51.303058
Surface Hole Longitude: -114.394419

For data sources see[1][2]

Well History

Date Event
2011-04-20 Obtained License
2011-09-12 Surface Casing Operation Performed
2011-09-15 Direction Drilling Operation Performed - Horizontal
2011-09-17 Well Log Performed
2011-09-21 Finished Drilling
2011-09-21 Well Log Performed
2011-09-21 Well Mode changed to Drilled and Cased
2011-09-25 Perforation Treatment Performed - Open-Hole Completion
2011-09-25 Production Casing Operation Performed
2011-09-25 Rig Released
2011-09-27 Well Log Performed
2011-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-05 Well Began Production
2011-10-05 Well Fluid changed to Crude Oil
2011-10-05 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-15 1895.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-25 Open Hole/Barefoot Completion 3874.50 3879.00 0
2011-10-04 Multi-Stage Fracture 3290.40 3290.50 0
2011-10-04 Multi-Stage Fracture 3228.30 3228.40 0
2011-10-04 Multi-Stage Fracture 3166.10 3166.20 0
2011-10-04 Multi-Stage Fracture 3103.50 3103.60 0
2011-10-04 Multi-Stage Fracture 3041.70 3041.80 0
2011-10-04 Multi-Stage Fracture 2968.00 2968.10 0
2011-10-04 Multi-Stage Fracture 2906.50 2906.60 0
2011-10-04 Multi-Stage Fracture 2845.20 2845.30 0
2011-10-04 Multi-Stage Fracture 2783.30 2783.40 0
2011-10-04 Multi-Stage Fracture 2720.90 2721.00 0
2011-10-04 Multi-Stage Fracture 3850.70 3850.80 0
2011-10-04 Multi-Stage Fracture 2658.70 2658.80 0
2011-10-04 Multi-Stage Fracture 2596.60 2596.70 0
2011-10-04 Multi-Stage Fracture 3798.80 3798.90 0
2011-10-04 Multi-Stage Fracture 3685.60 3685.70 0
2011-10-04 Multi-Stage Fracture 3611.90 3612.00 0
2011-10-04 Multi-Stage Fracture 3538.20 3538.30 0
2011-10-04 Multi-Stage Fracture 3476.30 3476.40 0
2011-10-04 Multi-Stage Fracture 3414.40 3414.50 0
2011-10-04 Multi-Stage Fracture 3352.50 3352.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1604 0.0 0.0 0.0
2012 7927 0.0 0.0 0.0
2013 6930 0.0 0.0 0.0
2014 6551 0.0 0.0 0.0
2015 8541 0.0 0.0 0.0
2016 8673 0.0 0.0 0.0
2017 8691 0.0 0.0 0.0
2018 8637 0.0 0.0 0.0
2019 8688 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

References