If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0275031801000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.313827,"lon":-114.401621,"icon":""}]} |
| Location: 00/01-18-027-03W5/0 | |
| Location Alias: 00/01-18-27-03 W5M | |
| Location Alias 2: 00/01-18-027-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 18 | |
| County/Municipality: Rocky View County | |
| Well Name: NAL LOCHEND 1-18-27-3 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0433034 | |
| License Date: 2011-04-15 | |
| License Status: Issued | |
| Spud Date: 2011-08-12 | |
| Final Drill Date: 2011-08-30 | |
| Well Total Depth: 3500.00 m | |
| Surface Hole Latitude: 51.313827 | |
| Surface Hole Longitude: -114.401621 |
| Date | Event |
|---|---|
| 2011-04-15 | Obtained License |
| 2011-08-15 | Surface Casing Operation Performed |
| 2011-08-18 | Direction Drilling Operation Performed - Horizontal |
| 2011-08-22 | Intermediate Casing Operation Performed |
| 2011-08-22 | Well Log Performed |
| 2011-08-30 | Finished Drilling |
| 2011-08-30 | Well Mode changed to Drilled and Cased |
| 2011-08-31 | Well Log Performed |
| 2011-09-01 | Liner Casing Operation Performed |
| 2011-09-02 | Rig Released |
| 2011-09-06 | Well Log Performed |
| 2011-09-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-15 | Well Began Production |
| 2011-10-15 | Well Fluid changed to Crude Oil |
| 2011-10-15 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-08-18 | 1980.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-09-11 | Multi-Stage Fracture | 3295.30 | 3295.40 | 0 |
| 2011-09-11 | Multi-Stage Fracture | 2647.20 | 2647.30 | 0 |
| 2011-09-11 | Multi-Stage Fracture | 2585.60 | 2585.70 | 0 |
| 2011-09-11 | Multi-Stage Fracture | 2523.60 | 2523.70 | 0 |
| 2011-09-11 | Multi-Stage Fracture | 3232.30 | 3232.40 | 0 |
| 2011-09-11 | Multi-Stage Fracture | 3155.10 | 3155.20 | 0 |
| 2011-09-11 | Multi-Stage Fracture | 3078.40 | 3078.50 | 0 |
| 2011-09-11 | Multi-Stage Fracture | 3002.40 | 3002.50 | 0 |
| 2011-09-11 | Multi-Stage Fracture | 2927.60 | 2927.70 | 0 |
| 2011-09-11 | Multi-Stage Fracture | 2850.00 | 2850.10 | 0 |
| 2011-09-11 | Multi-Stage Fracture | 2772.90 | 2773.00 | 0 |
| 2011-09-11 | Multi-Stage Fracture | 2710.10 | 2710.20 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 1362 | 0.0 | 0.0 | 0.0 |
| 2012 | 8095 | 0.0 | 0.0 | 0.0 |
| 2013 | 8300 | 0.0 | 0.0 | 0.0 |
| 2014 | 8295 | 0.0 | 0.0 | 0.0 |
| 2015 | 8724 | 0.0 | 0.0 | 0.0 |
| 2016 | 8745 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8631 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]