X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275032914000

Well Details

Well ID: 0275032914000
Loading map...
Location: 00/14-29-027-03W5/0
Location Alias: 00/14-29-27-03 W5M
Location Alias 2: 00/14-29-027-03 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 03
Section: 29
County/Municipality: Rocky View County
Well Name: NAL LOCHEND 14-29-27-3
Operator Name: NAL Resources Limited
License Number: 0430895
License Date: 2011-01-28
License Status: Issued
Spud Date: 2011-02-05
Final Drill Date: 2011-03-03
Well Total Depth: 3877.00 m
Surface Hole Latitude: 51.328467
Surface Hole Longitude: -114.389561

For data sources see[1][2]

Well History

Date Event
2011-01-28 Obtained License
2011-02-09 Surface Casing Operation Performed
2011-02-15 Direction Drilling Operation Performed - Horizontal
2011-02-19 Well Log Performed
2011-02-20 Intermediate Casing Operation Performed
2011-02-20 Well Log Performed
2011-03-03 Finished Drilling
2011-03-03 Well Log Performed
2011-03-03 Well Mode changed to Drilled and Cased
2011-03-06 Perforation Treatment Performed - Open-Hole Completion
2011-03-09 Liner Casing Operation Performed
2011-03-09 Rig Released
2011-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-15 Well Began Production
2011-04-15 Well Fluid changed to Crude Oil
2011-04-15 Well Mode changed to Pumping
2012-09-13 Well Fluid changed to Crude Oil
2012-09-13 Well Mode changed to Suspended
2012-11-01 Well Fluid changed to Crude Oil
2012-11-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-15 1950.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-06 Open Hole/Barefoot Completion 3872.00 3877.00 0
2011-03-15 Multi-Stage Fracture 3318.00 3318.10 0
2011-03-15 Multi-Stage Fracture 3408.60 3408.70 0
2011-03-15 Multi-Stage Fracture 3483.40 3483.50 0
2011-03-15 Multi-Stage Fracture 3570.30 3570.40 0
2011-03-15 Multi-Stage Fracture 3660.80 3660.90 0
2011-03-15 Multi-Stage Fracture 3739.60 3739.70 0
2011-03-15 Multi-Stage Fracture 3821.30 3821.40 0
2011-03-15 Multi-Stage Fracture 2606.40 2606.50 0
2011-03-15 Multi-Stage Fracture 2693.10 2693.20 0
2011-03-15 Multi-Stage Fracture 2775.30 2775.40 0
2011-03-15 Multi-Stage Fracture 2861.40 2861.50 0
2011-03-15 Multi-Stage Fracture 2947.40 2947.50 0
2011-03-15 Multi-Stage Fracture 3049.20 3049.30 0
2011-03-15 Multi-Stage Fracture 3154.70 3154.80 0
2011-03-15 Multi-Stage Fracture 3242.80 3242.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5586 0.0 0.0 0.0
2012 5456 0.0 0.0 0.0
2013 3417 0.0 0.0 0.0
2014 6814 0.0 0.0 0.0
2015 8479 0.0 0.0 0.0
2016 7356 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 8631 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References