X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275043615000

Well Details

Well ID: 0275043615000
Loading map...
Location: 00/15-36-027-04W5/0
Location Alias: 00/15-36-27-04 W5M
Location Alias 2: 00/15-36-027-04 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 04
Section: 36
County/Municipality: Rocky View County
Well Name: RIDGEBACK LOCHEND 15-36-27-4
Operator Name: Ridgeback Resources Inc.
License Number: 0446984
License Date: 2012-07-03
License Status: Issued
Spud Date: 2012-08-16
Final Drill Date: 2012-08-29
Well Total Depth: 4057.00 m
Surface Hole Latitude: 51.340328
Surface Hole Longitude: -114.436421

For data sources see[1][2]

Well History

Date Event
2012-07-03 Obtained License
2012-08-18 Surface Casing Operation Performed
2012-08-21 Direction Drilling Operation Performed - Deviate
2012-08-24 Well Log Performed
2012-08-25 Direction Drilling Operation Performed - Horizontal
2012-08-29 Finished Drilling
2012-08-29 Well Log Performed
2012-08-29 Well Mode changed to Drilled and Cased
2012-09-01 Perforation Treatment Performed - Open-Hole Completion
2012-09-01 Production Casing Operation Performed
2012-09-01 Rig Released
2012-09-07 Well Log Performed
2012-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-21 Well Began Production
2012-09-21 Well Fluid changed to Crude Oil
2012-09-21 Well Mode changed to Flowing
2013-03-27 Well Fluid changed to Crude Oil
2013-03-27 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-08-21 1851.00 Deviate (5 - 79 degrees)
2012-08-25 2615.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-01 Open Hole/Barefoot Completion 4053.00 4057.00 0
2012-09-18 Multi-Stage Fracture 3478.00 3478.10 0
2012-09-18 Multi-Stage Fracture 3403.10 3403.20 0
2012-09-19 Multi-Stage Fracture 3341.30 3341.40 0
2012-09-19 Multi-Stage Fracture 3265.60 3265.70 0
2012-09-19 Multi-Stage Fracture 3206.10 3206.20 0
2012-09-19 Multi-Stage Fracture 3130.50 3130.60 0
2012-09-19 Multi-Stage Fracture 3069.90 3070.00 0
2012-09-19 Multi-Stage Fracture 2993.00 2993.10 0
2012-09-19 Multi-Stage Fracture 2931.40 2931.50 0
2012-09-19 Multi-Stage Fracture 2856.50 2856.60 0
2012-09-18 Multi-Stage Fracture 4028.00 4028.10 0
2012-09-19 Multi-Stage Fracture 2781.00 2781.10 0
2012-09-19 Multi-Stage Fracture 2720.20 2720.30 0
2012-09-18 Multi-Stage Fracture 3959.70 3959.80 0
2012-09-18 Multi-Stage Fracture 3884.10 3884.20 0
2012-09-18 Multi-Stage Fracture 3822.80 3822.90 0
2012-09-18 Multi-Stage Fracture 3749.10 3749.20 0
2012-09-18 Multi-Stage Fracture 3688.20 3688.30 0
2012-09-18 Multi-Stage Fracture 3614.10 3614.20 0
2012-09-18 Multi-Stage Fracture 3539.50 3539.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 190 0.0 0.0 0.0
2013 6867 0.0 0.0 0.0
2014 8462 0.0 0.0 0.0
2015 7824 0.0 0.0 0.0
2016 8590 0.0 0.0 0.0
2017 8729 0.0 0.0 0.0
2018 8443 0.0 0.0 0.0
2019 8671 0.0 0.0 0.0
2020 1488 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-01 No Incident Encountered 0.00 0.00
2012-09-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References