X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275050804000

Well Details

Well ID: 0275050804000
Loading map...
Location: 00/04-08-027-05W5/0
Location Alias: 00/04-08-27-05 W5M
Location Alias 2: 00/04-08-027-05 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 05
Section: 08
County/Municipality: Rocky View County
Well Name: Canlin WCATH 4-8-27-5
Operator Name: Canlin Energy Corporation
License Number: 0036190
License Date: 1969-05-14
License Status: Issued
Spud Date: 1969-06-08
Final Drill Date: 1969-07-23
Well Total Depth: 2888.00 m
Surface Hole Latitude: 51.286501
Surface Hole Longitude: -114.679698

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-05-14 Obtained License
1969-07-23 Finished Drilling
1969-07-23 Well Mode changed to Drilled and Cased
1969-07-25 Production Casing Operation Performed
1969-07-29 Perforation Treatment Performed - Selective Jet Perforations
1969-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-11-02 Well Began Production
1969-11-02 Well Fluid changed to Gas
1969-11-02 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-07-29 Selective Jet Perforations 2699.30 2700.80 0
1969-07-29 Selective Jet Perforations 2794.40 2801.70 0
1969-07-29 Selective Jet Perforations 2804.20 2807.80 0
1969-07-29 Selective Jet Perforations 2812.10 2817.90 0
1969-07-29 Selective Jet Perforations 2825.20 2833.10 0
1969-07-29 Selective Jet Perforations 2834.00 2834.00 0
1969-08-12 Acid Treatment 2699.30 2834.00 0
1969-07-29 Selective Jet Perforations 2712.70 2715.80 0
1969-07-29 Selective Jet Perforations 2721.90 2724.90 0
1969-07-29 Selective Jet Perforations 2728.00 2746.20 0
1969-07-29 Selective Jet Perforations 2751.40 2754.20 0
1969-07-29 Selective Jet Perforations 2761.50 2765.10 0
1969-07-29 Selective Jet Perforations 2770.60 2777.00 0
1969-07-29 Selective Jet Perforations 2780.40 2782.80 0
1969-07-29 Selective Jet Perforations 2786.80 2791.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 1427 0.0 0.0 0.0
1970 8388 0.0 0.0 0.0
1971 8465 0.0 0.0 0.0
1972 6911 0.0 0.0 0.0
1973 8474 0.0 0.0 0.0
1974 7834 0.0 0.0 0.0
1975 6438 0.0 0.0 0.0
1976 5491 0.0 0.0 0.0
1977 7498 0.0 0.0 0.0
1978 7590 0.0 0.0 0.0
1979 8280 0.0 0.0 0.0
1980 6120 0.0 0.0 0.0
1981 7438 0.0 0.0 0.0
1982 6757 0.0 0.0 0.0
1983 6688 0.0 0.0 0.0
1984 6326 0.0 0.0 0.0
1985 5835 0.0 0.0 0.0
1986 3849 0.0 0.0 0.0
1987 8195 0.0 0.0 0.0
1988 8290 0.0 0.0 0.0
1989 6025 0.0 0.0 0.0
1990 6582 0.0 0.0 0.0
1991 4974 0.0 0.0 0.0
1992 7870 0.0 0.0 0.0
1993 7975 0.0 0.0 0.0
1994 8727 0.0 0.0 0.0
1995 8718 0.0 0.0 0.0
1996 8782 0.0 0.0 0.0
1997 8612 0.0 0.0 0.0
1998 8601 0.0 0.0 0.0
1999 8333 0.0 0.0 0.0
2000 8743 0.0 0.0 0.0
2001 8218 0.0 0.0 0.0
2002 8710 0.0 0.0 0.0
2003 8711 0.0 0.0 0.0
2004 8674 0.0 0.0 0.0
2005 8104 0.0 0.0 0.0
2006 8752 0.0 0.0 0.0
2007 8754 0.0 0.0 0.0
2008 8757 0.0 0.0 0.0
2009 8330 0.0 0.0 0.0
2010 8755 0.0 0.0 0.0
2011 8749 0.0 0.0 0.0
2012 8763 0.0 0.0 0.0
2013 7981 0.0 0.0 0.0
2014 8725 0.0 0.0 0.0
2015 8686 0.0 0.0 0.0
2016 8694 0.0 0.0 0.0
2017 8581 0.0 0.0 0.0
2018 7982 0.0 0.0 0.0
2019 6693 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References