X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275061310000

Well Details

Well ID: 0275061310000
Loading map...
Location: 00/10-13-027-06W5/0
Location Alias: 00/10-13-27-06 W5M
Location Alias 2: 00/10-13-027-06 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 06
Section: 13
County/Municipality: Stoney 142B
Well Name: Canlin WCATH 10-13-27-6
Operator Name: Canlin Energy Corporation
License Number: 0017519
License Date: 1959-08-05
License Status: Issued
Spud Date: 1959-08-10
Final Drill Date: 1959-12-03
Well Total Depth: 3134.90 m
Surface Hole Latitude: 51.308181
Surface Hole Longitude: -114.717179

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-08-05 Obtained License
1959-12-03 Finished Drilling
1959-12-06 Production Casing Operation Performed
1959-12-13 Perforation Treatment Performed - Bullet Perforation
1959-12-14 Perforation Treatment Performed - Acid Wash - No Pressure
1960-01-22 Well Mode changed to Drilled and Cased
1961-12-28 Well Began Production
1961-12-28 Well Fluid changed to Gas
1961-12-28 Well Mode changed to Flowing
1982-10-14 Perforation Treatment Performed - Fractured
1988-12-17 Perforation Treatment Performed - Jet Perforation
1988-12-18 Perforation Treatment Performed - Jet Perforation
1989-12-21 Well Log Performed
1990-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-22 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-12-13 Bullet Perforation 3097.70 3106.80 13
1959-12-13 Bullet Perforation 3088.50 3097.70 13
1959-12-13 Bullet Perforation 3106.50 3115.70 13
1959-12-14 Acid Wash 3088.50 3115.70 0
1982-10-14 Fracture 3088.50 3115.70 0
1988-12-17 Perforation 3073.00 3115.00 7
1988-12-18 Perforation 3053.00 3073.00 7
1990-01-12 Acid Treatment 3053.00 3115.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 8146 0.0 0.0 0.0
1970 5227 0.0 0.0 0.0
1971 7087 0.0 0.0 0.0
1972 5427 0.0 0.0 0.0
1973 7059 0.0 0.0 0.0
1974 6271 0.0 0.0 0.0
1975 6861 0.0 0.0 0.0
1976 6009 0.0 0.0 0.0
1977 6336 0.0 0.0 0.0
1978 5347 0.0 0.0 0.0
1979 6253 0.0 0.0 0.0
1980 6088 0.0 0.0 0.0
1981 2862 0.0 0.0 0.0
1982 3840 0.0 0.0 0.0
1983 6079 0.0 0.0 0.0
1984 2123 0.0 0.0 0.0
1985 4387 0.0 0.0 0.0
1986 1947 0.0 0.0 0.0
1987 5890 0.0 0.0 0.0
1988 8253 0.0 0.0 0.0
1989 6933 0.0 0.0 0.0
1990 8099 0.0 0.0 0.0
1991 8041 0.0 0.0 0.0
1992 8240 0.0 0.0 0.0
1993 8206 0.0 0.0 0.0
1994 8727 0.0 0.0 0.0
1995 8709 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8243 0.0 0.0 0.0
1998 4829 0.0 0.0 0.0
1999 8194 0.0 0.0 0.0
2000 8316 0.0 0.0 0.0
2001 8183 0.0 0.0 0.0
2002 8442 0.0 0.0 0.0
2003 8679 0.0 0.0 0.0
2004 8071 0.0 0.0 0.0
2005 7773 0.0 0.0 0.0
2006 8372 0.0 0.0 0.0
2007 8014 0.0 0.0 0.0
2008 8439 0.0 0.0 0.0
2009 8104 0.0 0.0 0.0
2010 8475 0.0 0.0 0.0
2011 8331 0.0 0.0 0.0
2012 8446 0.0 0.0 0.0
2013 7544 0.0 0.0 0.0
2014 8681 0.0 0.0 0.0
2015 7583 0.0 0.0 0.0
2016 4265 0.0 0.0 0.0
2017 5424 0.0 0.0 0.0
2018 4828 0.0 0.0 0.0
2019 4166 0.0 0.0 0.0
2020 1806 0.0 0.0 0.0

For data sources see[5]

References