X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275061902000

Well Details

Well ID: 0275061902000
Loading map...
Location: 00/02-19-027-06W5/0
Location Alias: 00/02-19-27-06 W5M
Location Alias 2: 00/02-19-027-06 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 06
Section: 19
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 2-19-27-6
Operator Name: Canlin Energy Corporation
License Number: 0271737
License Date: 2002-07-12
License Status: Amended
Spud Date: 2002-09-04
Final Drill Date: 2002-09-21
Well Total Depth: 2503.00 m
Surface Hole Latitude: 51.313175
Surface Hole Longitude: -114.841157

For data sources see[1][2]

Well History

Date Event
2002-07-12 Obtained License
2002-09-04 Direction Drilling Operation Performed - Deviate
2002-09-07 Surface Casing Operation Performed
2002-09-21 Finished Drilling
2002-09-21 Well Log Performed
2002-09-22 Well Log Performed
2002-09-24 Well Log Performed
2002-09-25 Production Casing Operation Performed
2002-09-25 Rig Released
2002-09-25 Well Mode changed to Drilled and Cased
2002-10-21 Well Log Performed
2002-10-23 Perforation Treatment Performed - Jet Perforation
2002-10-23 Well Log Performed
2002-10-25 Perforation Treatment Performed - Fractured
2002-10-27 Perforation Treatment Performed - Jet Perforation
2002-10-27 Well Log Performed
2002-10-29 Perforation Treatment Performed - Fractured
2002-10-31 Well Log Performed
2002-11-05 Perforation Treatment Performed - Jet Perforation
2002-11-05 Well Log Performed
2002-11-06 Perforation Treatment Performed - Cement Squeeze
2002-11-15 Well Log Performed
2002-12-09 Well Began Production
2002-12-09 Well Fluid changed to Gas
2002-12-09 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-09-04 29.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-10-23 Perforation 2019.00 2021.00 14
2002-10-27 Perforation 1896.00 1902.00 14
2002-10-27 Perforation 1902.00 1906.50 14
2002-10-27 Perforation 1914.50 1920.50 14
2002-10-29 Fracture 1896.00 1906.50 0
2002-10-29 Fracture 1914.50 1920.50 0
2002-11-05 Perforation 703.00 704.00 14
2002-11-06 Cement Squeeze 703.00 704.00 0
2002-10-23 Perforation 2023.00 2029.00 14
2002-10-23 Perforation 2029.00 2035.00 14
2002-10-23 Perforation 2037.00 2042.00 14
2002-10-23 Perforation 2042.00 2047.00 14
2002-10-23 Perforation 2047.00 2052.00 14
2002-10-25 Fracture 2037.00 2052.00 0
2002-10-25 Fracture 2023.00 2035.00 0
2002-10-25 Fracture 2019.00 2021.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 483 0.0 0.0 0.0
2003 6402 0.0 0.0 0.0
2004 7001 0.0 0.0 0.0
2005 6893 0.0 0.0 0.0
2006 8294 0.0 0.0 0.0
2007 8404 0.0 0.0 0.0
2008 6477 0.0 0.0 0.0
2009 7482 0.0 0.0 0.0
2010 7667 0.0 0.0 0.0
2011 8043 0.0 0.0 0.0
2012 7663 0.0 0.0 0.0
2013 6592 0.0 0.0 0.0
2014 7921 0.0 0.0 0.0
2015 8330 0.0 0.0 0.0
2016 7456 0.0 0.0 0.0
2017 7920 0.0 0.0 0.0
2018 8137 0.0 0.0 0.0
2019 4811 0.0 0.0 0.0
2020 1685 0.0 0.0 0.0

For data sources see[6]

References