X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275062602000

Well Details

Well ID: 0275062602000
Loading map...
Location: 00/02-26-027-06W5/0
Location Alias: 00/02-26-27-06 W5M
Location Alias 2: 00/02-26-027-06 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 06
Section: 26
County/Municipality: Stoney 142B
Well Name: Canlin WCATH 2-26-27-6
Operator Name: Canlin Energy Corporation
License Number: 0171304
License Date: 1994-10-07
License Status: Amended
Spud Date: 1994-10-28
Final Drill Date: 1994-11-18
Well Total Depth: 2314.00 m
Surface Hole Latitude: 51.331620
Surface Hole Longitude: -114.739739

For data sources see[1][2]

Well History

Date Event
1994-10-07 Obtained License
1994-10-24 Well Log Performed
1994-10-31 Surface Casing Operation Performed
1994-11-06 Direction Drilling Operation Performed - Deviate
1994-11-18 Finished Drilling
1994-11-18 Well Log Performed
1994-11-18 Well Mode changed to Drilled and Cased
1994-11-19 Well Log Performed
1994-11-21 Well Log Performed
1994-11-22 Production Casing Operation Performed
1994-11-23 Rig Released
1995-01-12 Perforation Treatment Performed - Jet Perforation
1995-01-12 Well Log Performed
1995-01-18 Perforation Treatment Performed - Fractured
1995-01-22 Well Log Performed
1995-04-06 Well Began Production
1995-04-06 Well Fluid changed to Gas
1995-04-06 Well Mode changed to Flowing
1998-08-04 Perforation Treatment Performed - Fractured
2001-09-20 Perforation Treatment Performed - Jet Perforation
2001-09-20 Well Log Performed
2001-09-24 Perforation Treatment Performed - Chemical Squeeze
2019-09-21 Well Fluid changed to Gas
2019-09-21 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-11-06 1102.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-12 Perforation 2110.00 2114.00 17
1995-01-12 Perforation 2128.00 2133.00 17
1995-01-18 Fracture 2110.00 2133.00 0
1998-08-04 Fracture 2128.00 2133.00 0
2001-09-20 Perforation 2110.00 2114.00 14
2001-09-24 Chemical Squeeze 2110.00 2133.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 6222 0.0 0.0 0.0
1996 7967 0.0 0.0 0.0
1997 7977 0.0 0.0 0.0
1998 5038 0.0 0.0 0.0
2001 1796 0.0 0.0 0.0
2002 7875 0.0 0.0 0.0
2003 8681 0.0 0.0 0.0
2004 7942 0.0 0.0 0.0
2005 6809 0.0 0.0 0.0
2006 7713 0.0 0.0 0.0
2007 7170 0.0 0.0 0.0
2008 7993 0.0 0.0 0.0
2009 3853 0.0 0.0 0.0
2010 6529 0.0 0.0 0.0
2011 4842 0.0 0.0 0.0
2012 4808 0.0 0.0 0.0
2013 3475 0.0 0.0 0.0
2014 3370 0.0 0.0 0.0
2015 4266 0.0 0.0 0.0
2016 1073 0.0 0.0 0.0
2017 1508 0.0 0.0 0.0
2018 436 0.0 0.0 0.0

For data sources see[6]

References