If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0275062809000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.339555,"lon":-114.788907,"icon":""}]} |
Location: 00/09-28-027-06W5/0 | |
Location Alias: 00/09-28-27-06 W5M | |
Location Alias 2: 00/09-28-027-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 5 | |
Range: 06 | |
Section: 28 | |
County/Municipality: Stoney 142B | |
Well Name: Canlin WCATH 9-28-27-6 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0314587 | |
License Date: 2004-09-10 | |
License Status: Issued | |
Spud Date: 2004-11-04 | |
Final Drill Date: 2004-12-14 | |
Well Total Depth: 2650.00 m | |
Surface Hole Latitude: 51.339555 | |
Surface Hole Longitude: -114.788907 |
Date | Event |
---|---|
2004-09-10 | Obtained License |
2004-11-04 | Direction Drilling Operation Performed - Deviate |
2004-11-10 | Surface Casing Operation Performed |
2004-12-14 | Finished Drilling |
2004-12-14 | Well Log Performed |
2004-12-14 | Well Mode changed to Drilled and Cased |
2004-12-15 | Well Log Performed |
2004-12-16 | Production Casing Operation Performed |
2004-12-19 | Rig Released |
2005-01-14 | Well Log Performed |
2005-01-17 | Perforation Treatment Performed - Jet Perforation |
2005-01-17 | Well Log Performed |
2005-01-25 | Perforation Treatment Performed - Fractured |
2005-07-29 | Well Began Production |
2005-07-29 | Well Fluid changed to Gas |
2005-07-29 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2004-11-04 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-01-17 | Perforation | 2542.00 | 2543.50 | 17 |
2005-01-17 | Perforation | 2545.00 | 2550.00 | 17 |
2005-01-17 | Perforation | 2551.00 | 2561.00 | 17 |
2005-01-25 | Fracture | 2542.00 | 2561.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2059 | 0.0 | 0.0 | 0.0 |
2006 | 8142 | 0.0 | 0.0 | 0.0 |
2007 | 8643 | 0.0 | 0.0 | 0.0 |
2008 | 8283 | 0.0 | 0.0 | 0.0 |
2009 | 7877 | 0.0 | 0.0 | 0.0 |
2010 | 8387 | 0.0 | 0.0 | 0.0 |
2011 | 8278 | 0.0 | 0.0 | 0.0 |
2012 | 8548 | 0.0 | 0.0 | 0.0 |
2013 | 8183 | 0.0 | 0.0 | 0.0 |
2014 | 7924 | 0.0 | 0.0 | 0.0 |
2015 | 3477 | 0.0 | 0.0 | 0.0 |
2016 | 8039 | 0.0 | 0.0 | 0.0 |
2017 | 8402 | 0.0 | 0.0 | 0.0 |
2018 | 6927 | 0.0 | 0.0 | 0.0 |
2019 | 4704 | 0.0 | 0.0 | 0.0 |
2020 | 285 | 0.0 | 0.0 | 0.0 |
For data sources see[6]