If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284020515000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.370682,"lon":-110.24823,"icon":""}]} |
| Location: 00/15-05-028-02W4/0 | |
| Location Alias: 00/15-05-28-02 W4M | |
| Location Alias 2: 00/15-05-028-02 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 02 | |
| Section: 05 | |
| County/Municipality: Special Areas No. 3 | |
| Well Name: HARVEST SIBBALD 15-5-28-2 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0002197 | |
| License Date: 1950-10-25 | |
| License Status: Abandoned | |
| Spud Date: 1950-10-30 | |
| Final Drill Date: 1950-12-05 | |
| Well Total Depth: 1092.10 m | |
| Surface Hole Latitude: 51.370682 | |
| Surface Hole Longitude: -110.248230 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1950-10-25 | Obtained License |
| 1950-11-11 | Drill Stem Test Performed |
| 1950-11-12 | Drill Stem Test Performed |
| 1950-11-29 | Drill Stem Test Performed |
| 1950-12-05 | Drill Stem Test Performed |
| 1950-12-05 | Finished Drilling |
| 1950-12-10 | Production Casing Operation Performed |
| 1950-12-12 | Perforation Treatment Performed - Bullet Perforation |
| 1950-12-13 | Perforation Treatment Performed - Cement Squeeze |
| 1950-12-17 | Perforation Treatment Performed - Bullet Perforation |
| 1950-12-19 | Perforation Treatment Performed - Bullet Perforation |
| 1950-12-22 | Perforation Treatment Performed - Bullet Perforation |
| 1950-12-22 | Perforation Treatment Performed - Cement Squeeze |
| 1950-12-23 | Perforation Treatment Performed - Cement Squeeze |
| 1950-12-27 | Perforation Treatment Performed - Bullet Perforation |
| 1950-12-29 | Perforation Treatment Performed - Bullet Perforation |
| 1950-12-29 | Perforation Treatment Performed - Cement Squeeze |
| 1951-01-01 | Perforation Treatment Performed - Bullet Perforation |
| 1951-01-02 | Well Mode changed to Drilled and Cased |
| 1958-10-27 | Well Began Production |
| 1958-10-27 | Well Fluid changed to Gas |
| 1958-10-27 | Well Mode changed to Flowing |
| 1976-12-11 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1994-08-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-08-26 | Perforation Treatment Performed - Jet Perforation |
| 1994-08-26 | Plug Back Performed |
| 1994-08-26 | Well Log Performed |
| 1994-08-27 | Perforation Treatment Performed - Remedial Casing |
| 1994-08-27 | Well Abandoned |
| 1994-08-27 | Well Fluid changed to Gas |
| 1994-08-27 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1950-12-12 | Bullet Perforation | 734.60 | 736.40 | 39 |
| 1950-12-29 | Cement Squeeze | 725.40 | 727.30 | 0 |
| 1951-01-01 | Bullet Perforation | 743.70 | 751.60 | 39 |
| 1976-12-11 | Acid Wash | 746.80 | 751.60 | 0 |
| 1994-08-26 | Packing Device Capped w/Cement | 725.00 | 733.00 | 0 |
| 1994-08-26 | Perforation | 334.00 | 335.00 | 13 |
| 1994-08-27 | Remedial Casing Cementing | 334.00 | 335.00 | 0 |
| 1994-08-27 | Remedial Casing Cementing | 334.00 | 335.00 | 0 |
| 1950-12-13 | Cement Squeeze | 734.60 | 736.40 | 0 |
| 1950-12-17 | Bullet Perforation | 924.50 | 927.80 | 39 |
| 1950-12-19 | Bullet Perforation | 914.40 | 916.80 | 39 |
| 1950-12-22 | Cement Squeeze | 914.40 | 927.80 | 0 |
| 1950-12-22 | Bullet Perforation | 808.30 | 812.00 | 39 |
| 1950-12-23 | Cement Squeeze | 808.30 | 812.00 | 0 |
| 1950-12-27 | Bullet Perforation | 755.30 | 760.80 | 39 |
| 1950-12-29 | Bullet Perforation | 725.40 | 727.30 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 0 | 0.0 | 0.0 | 0.0 |
| 1968 | 1162 | 0.0 | 0.0 | 0.0 |
| 1969 | 6655 | 0.0 | 0.0 | 0.0 |
| 1970 | 7328 | 0.0 | 0.0 | 0.0 |
| 1971 | 8279 | 0.0 | 0.0 | 0.0 |
| 1972 | 7653 | 0.0 | 0.0 | 0.0 |
| 1973 | 7492 | 0.0 | 0.0 | 0.0 |
| 1974 | 8661 | 0.0 | 0.0 | 0.0 |
| 1975 | 5649 | 0.0 | 0.0 | 0.0 |
| 1976 | 4375 | 0.0 | 0.0 | 0.0 |
| 1977 | 5734 | 0.0 | 0.0 | 0.0 |
| 1978 | 6714 | 0.0 | 0.0 | 0.0 |
| 1979 | 7920 | 0.0 | 0.0 | 0.0 |
| 1980 | 7921 | 0.0 | 0.0 | 0.0 |
| 1981 | 7639 | 0.0 | 0.0 | 0.0 |
| 1982 | 6200 | 0.0 | 0.0 | 0.0 |
| 1983 | 6770 | 0.0 | 0.0 | 0.0 |
| 1984 | 6560 | 0.0 | 0.0 | 0.0 |
| 1985 | 3220 | 0.0 | 0.0 | 0.0 |
| 1986 | 5651 | 0.0 | 0.0 | 0.0 |
| 1987 | 5728 | 0.0 | 0.0 | 0.0 |
| 1988 | 4683 | 0.0 | 0.0 | 0.0 |
| 1989 | 6237 | 0.0 | 0.0 | 0.0 |
| 1990 | 4851 | 0.0 | 0.0 | 0.0 |
| 1991 | 1004 | 0.0 | 0.0 | 0.0 |
For data sources see[5]