X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284123011000

Well Details

Well ID: 0284123011000
Loading map...
Location: 00/11-30-028-12W4/0
Location Alias: 00/11-30-28-12 W4M
Location Alias 2: 00/11-30-028-12 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 12
Section: 30
County/Municipality: Special Areas No. 2
Well Name: CALIBRE ETAL STANMORE 11-30-28-12
Operator Name: Calibre Energy Inc.
License Number: 0144680
License Date: 1990-07-04
License Status: Re-Entered
Spud Date: 1990-07-11
Final Drill Date: 1990-07-15
Well Total Depth: 1171.00 m
Surface Hole Latitude: 51.426527
Surface Hole Longitude: -111.686552

For data sources see[1][2]

Well History

Date Event
1990-07-04 Obtained License
1990-07-12 Surface Casing Operation Performed
1990-07-15 Drill Stem Test Performed
1990-07-15 Finished Drilling
1990-07-15 Well Log Performed
1990-07-15 Well Mode changed to Drilled and Cased
1990-07-16 Drill Stem Test Performed
1990-07-18 Production Casing Operation Performed
1990-07-18 Rig Released
1990-08-21 Perforation Treatment Performed - Jet Perforation
1990-08-21 Well Log Performed
1990-08-23 Perforation Treatment Performed - Fractured
1990-09-01 Well Began Production
1990-09-01 Well Fluid changed to Crude Oil
1990-09-01 Well Mode changed to Pumping
1991-06-30 Well Fluid changed to Crude Oil
1991-06-30 Well Mode changed to Suspended
1991-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-11 Plug Back Performed
1991-07-11 Well Log Performed
1993-06-13 Well Abandoned
1993-06-13 Well Fluid changed to Crude Oil
1993-06-13 Well Mode changed to Abandoned
1993-06-14 Well Fluid changed to Crude Oil
1993-06-14 Well Mode changed to Abandoned and Re-entered
2006-01-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-08-21 Perforation 1135.00 1140.00 12
1990-08-23 Fracture 1135.00 1140.00 0
1991-07-11 Packing Device Capped w/Cement 1122.00 1130.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2620 0.0 0.0 0.0
1991 3748 0.0 0.0 0.0

For data sources see[5]

References