X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284192214000

Well Details

Well ID: 0284192214000
Loading map...
Location: 00/14-22-028-19W4/0
Location Alias: 00/14-22-28-19 W4M
Location Alias 2: 00/14-22-028-19 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 19
Section: 22
County/Municipality: Drumheller
Well Name: EOG ETAL DRUMHELLER 14-22-28-19
Operator Name: Canadian Natural Resources Limited
License Number: 0085477
License Date: 1980-09-08
License Status: Issued
Spud Date: 1980-09-08
Final Drill Date: 1980-09-21
Well Total Depth: 1295.00 m
Surface Hole Latitude: 51.413054
Surface Hole Longitude: -112.598804

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-08 Obtained License
1980-09-11 Drill Stem Test Performed
1980-09-19 Drill Stem Test Performed
1980-09-21 Finished Drilling
1980-09-21 Well Mode changed to Drilled and Cased
1980-09-22 Drill Stem Test Performed
1980-09-23 Drill Stem Test Performed
1980-09-24 Production Casing Operation Performed
1980-10-22 Perforation Treatment Performed - Jet Perforation
1980-10-23 Perforation Treatment Performed - Fractured
1981-02-06 Well Began Production
1981-02-06 Well Fluid changed to Crude Oil
1981-02-06 Well Mode changed to Pumping
2001-12-16 Well Log Performed
2001-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-17 Plug Back Performed
2001-12-17 Well Log Performed
2001-12-18 Perforation Treatment Performed - Jet Perforation
2001-12-18 Perforation Treatment Performed - Remedial Casing
2001-12-22 Perforation Treatment Performed - Jet Perforation
2001-12-22 Well Log Performed
2005-10-01 Well Fluid changed to Crude Oil
2005-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-22 Perforation 1257.50 1260.50 7
1980-10-23 Fracture 1257.50 1260.50 0
2001-12-17 Packing Device Capped w/Cement 1242.00 1250.00 0
2001-12-18 Perforation 475.00 475.80 13
2001-12-18 Remedial Casing Cementing 475.00 475.80 0
2001-12-22 Perforation 445.00 450.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 7473 0.0 0.0 0.0
1982 4506 0.0 0.0 0.0
1983 3508 0.0 0.0 0.0
1984 8091 0.0 0.0 0.0
1985 6289 0.0 0.0 0.0
1986 4407 0.0 0.0 0.0
1987 5443 0.0 0.0 0.0
1988 4454 0.0 0.0 0.0
1989 4563 0.0 0.0 0.0
1990 8175 0.0 0.0 0.0
1991 7329 0.0 0.0 0.0
1992 6536 0.0 0.0 0.0
1993 8494 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 3966 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 1602 0.0 0.0 0.0
1998 7676 0.0 0.0 0.0
1999 6817 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 1224 0.0 0.0 0.0

For data sources see[5]

References