X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284192214002

Well Details

Well ID: 0284192214002
Loading map...
Location: 00/14-22-028-19W4/2
Location Alias: 00/14-22-28-19 W4M
Location Alias 2: 00/14-22-028-19 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 19
Section: 22
County/Municipality: Drumheller
Well Name: EOG ETAL DRUMHELLER 14-22-28-19
Operator Name: Canadian Natural Resources Limited
License Number: 0085477
License Date: 1980-09-08
License Status: Issued
Spud Date: 1980-09-08
Final Drill Date: 1980-09-21
Well Total Depth: 1295.00 m
Surface Hole Latitude: 51.413054
Surface Hole Longitude: -112.598804

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-08 Obtained License
1980-09-11 Drill Stem Test Performed
1980-09-19 Drill Stem Test Performed
1980-09-21 Finished Drilling
1980-09-21 Well Mode changed to Drilled and Cased
1980-09-22 Drill Stem Test Performed
1980-09-23 Drill Stem Test Performed
1980-09-24 Production Casing Operation Performed
1980-10-22 Perforation Treatment Performed - Jet Perforation
1980-10-23 Perforation Treatment Performed - Fractured
2001-12-16 Well Log Performed
2001-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-17 Plug Back Performed
2001-12-17 Well Log Performed
2001-12-18 Perforation Treatment Performed - Jet Perforation
2001-12-18 Perforation Treatment Performed - Remedial Casing
2001-12-22 Perforation Treatment Performed - Jet Perforation
2001-12-22 Well Log Performed
2002-03-04 Well Began Production
2002-03-04 Well Fluid changed to Gas
2002-03-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-22 Perforation 1257.50 1260.50 7
1980-10-23 Fracture 1257.50 1260.50 0
2001-12-17 Packing Device Capped w/Cement 1242.00 1250.00 0
2001-12-18 Perforation 475.00 475.80 13
2001-12-18 Remedial Casing Cementing 475.00 475.80 0
2001-12-22 Perforation 445.00 450.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 7133 0.0 0.0 0.0
2003 8645 0.0 0.0 0.0
2004 8223 0.0 0.0 0.0
2005 8579 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8703 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8586 0.0 0.0 0.0
2010 8713 0.0 0.0 0.0
2011 8740 0.0 0.0 0.0
2012 8769 0.0 0.0 0.0
2013 8741 0.0 0.0 0.0
2014 8692 0.0 0.0 0.0
2015 8753 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8559 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References