X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284250114002

Well Details

Well ID: 0284250114002
Loading map...
Location: 00/14-01-028-25W4/2
Location Alias: 00/14-01-28-25 W4M
Location Alias 2: 00/14-01-028-25 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 01
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 14-1-28-25
Operator Name: Ember Resources Inc.
License Number: 0325108
License Date: 2005-01-26
License Status: Issued
Spud Date: 2005-05-27
Final Drill Date: 2005-07-09
Well Total Depth: 710.00 m
Surface Hole Latitude: 51.369167
Surface Hole Longitude: -113.392736

For data sources see[1][2]

Well History

Date Event
2005-01-26 Obtained License
2005-05-27 Surface Casing Operation Performed
2005-07-09 Finished Drilling
2005-07-09 Production Casing Operation Performed
2005-07-09 Well Mode changed to Drilled and Cased
2005-07-10 Rig Released
2005-07-14 Well Log Performed
2005-07-25 Perforation Treatment Performed - Jet Perforation
2005-09-26 Perforation Treatment Performed - Jet Perforation
2005-10-14 Perforation Treatment Performed - Fractured
2005-10-28 Well Began Production
2005-10-28 Well Fluid changed to Coalbed Methane-Coals and Other
2005-10-28 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-25 Perforation 504.00 506.00 13
2005-09-26 Perforation 513.10 513.60 13
2005-09-26 Perforation 478.00 478.50 13
2005-09-26 Perforation 471.50 472.00 13
2005-09-26 Perforation 470.50 471.00 13
2005-09-26 Perforation 463.60 464.10 13
2005-09-26 Perforation 458.40 459.40 13
2005-09-26 Perforation 455.30 455.80 13
2005-09-26 Perforation 437.80 438.30 13
2005-09-26 Perforation 427.20 427.70 13
2005-09-26 Perforation 421.00 421.50 13
2005-09-26 Perforation 589.50 590.00 13
2005-09-26 Perforation 410.80 411.30 13
2005-09-26 Perforation 408.50 409.00 13
2005-09-26 Perforation 407.50 408.00 13
2005-09-26 Perforation 358.50 359.00 13
2005-09-26 Perforation 306.10 306.60 13
2005-09-26 Perforation 295.00 295.50 13
2005-09-26 Perforation 286.10 286.60 13
2005-09-26 Perforation 187.30 187.80 13
2005-09-26 Perforation 185.00 185.50 13
2005-09-26 Perforation 182.60 183.10 13
2005-09-26 Perforation 578.50 579.50 13
2005-09-26 Perforation 178.20 178.70 13
2005-10-14 Fracture 178.20 590.00 0
2005-09-26 Perforation 561.50 562.00 13
2005-09-26 Perforation 547.10 547.60 13
2005-09-26 Perforation 542.50 543.00 13
2005-09-26 Perforation 536.00 536.50 13
2005-09-26 Perforation 529.50 530.00 13
2005-09-26 Perforation 522.20 522.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1560 0.0 0.0 0.0
2006 8753 0.0 0.0 0.0
2007 8280 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8718 0.0 0.0 0.0
2011 8746 0.0 0.0 0.0
2012 8755 0.0 0.0 0.0
2013 8607 0.0 0.0 0.0
2014 8529 0.0 0.0 0.0
2015 8691 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8745 0.0 0.0 0.0
2019 8562 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

References