If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284250202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.360808,"lon":-113.412946,"icon":""}]} |
Location: 00/02-02-028-25W4/0 | |
Location Alias: 00/02-02-28-25 W4M | |
Location Alias 2: 00/02-02-028-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 25 | |
Section: 02 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 2-2-28-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0302461 | |
License Date: 2004-01-23 | |
License Status: Issued | |
Spud Date: 2004-02-06 | |
Final Drill Date: 2004-02-07 | |
Well Total Depth: 715.00 m | |
Surface Hole Latitude: 51.360808 | |
Surface Hole Longitude: -113.412946 |
Date | Event |
---|---|
2004-01-23 | Obtained License |
2004-02-06 | Surface Casing Operation Performed |
2004-02-07 | Finished Drilling |
2004-02-07 | Production Casing Operation Performed |
2004-02-07 | Rig Released |
2004-02-07 | Well Mode changed to Drilled and Cased |
2004-02-25 | Well Log Performed |
2004-03-05 | Perforation Treatment Performed - Jet Perforation |
2004-05-01 | Perforation Treatment Performed - Fractured |
2004-05-15 | Well Fluid changed to Gas |
2004-05-15 | Well Mode changed to Testing |
2004-05-30 | Perforation Treatment Performed - Jet Perforation |
2004-06-23 | Perforation Treatment Performed - Fractured |
2004-10-22 | Well Began Production |
2004-10-22 | Well Fluid changed to Gas |
2004-10-22 | Well Mode changed to Flowing |
2005-01-22 | Perforation Treatment Performed - Jet Perforation |
2005-01-24 | Perforation Treatment Performed - Fractured |
2005-01-29 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-01-29 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-03-05 | Perforation | 664.00 | 667.00 | 13 |
2005-01-22 | Perforation | 540.70 | 541.20 | 13 |
2005-01-22 | Perforation | 531.40 | 531.90 | 13 |
2005-01-22 | Perforation | 525.00 | 525.50 | 13 |
2005-01-22 | Perforation | 487.20 | 487.70 | 13 |
2005-01-22 | Perforation | 478.40 | 478.90 | 13 |
2005-01-22 | Perforation | 477.50 | 478.00 | 13 |
2005-01-22 | Perforation | 464.90 | 465.40 | 13 |
2005-01-22 | Perforation | 458.90 | 459.40 | 13 |
2005-01-22 | Perforation | 441.70 | 442.20 | 13 |
2005-01-22 | Perforation | 437.00 | 438.00 | 13 |
2004-05-01 | Fracture | 664.00 | 667.00 | 0 |
2005-01-22 | Perforation | 432.90 | 433.40 | 13 |
2005-01-22 | Perforation | 426.20 | 426.70 | 13 |
2005-01-22 | Perforation | 416.20 | 416.70 | 13 |
2005-01-22 | Perforation | 413.40 | 413.90 | 13 |
2005-01-22 | Perforation | 356.30 | 356.80 | 13 |
2005-01-22 | Perforation | 309.40 | 309.90 | 13 |
2005-01-22 | Perforation | 303.90 | 304.40 | 13 |
2005-01-22 | Perforation | 301.60 | 302.10 | 13 |
2005-01-22 | Perforation | 298.70 | 299.20 | 13 |
2005-01-22 | Perforation | 291.60 | 292.10 | 13 |
2004-05-30 | Perforation | 515.00 | 518.00 | 14 |
2005-01-22 | Perforation | 193.10 | 193.60 | 13 |
2005-01-24 | Fracture | 193.10 | 590.60 | 0 |
2004-06-23 | Fracture | 515.00 | 518.00 | 0 |
2005-01-22 | Perforation | 590.10 | 590.60 | 13 |
2005-01-22 | Perforation | 571.80 | 572.30 | 13 |
2005-01-22 | Perforation | 557.40 | 557.90 | 13 |
2005-01-22 | Perforation | 555.10 | 555.60 | 13 |
2005-01-22 | Perforation | 548.00 | 548.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 1704 | 0.0 | 0.0 | 0.0 |
2005 | 8413 | 0.0 | 0.0 | 0.0 |
2006 | 8685 | 0.0 | 0.0 | 0.0 |
2007 | 8708 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8678 | 0.0 | 0.0 | 0.0 |
2011 | 8682 | 0.0 | 0.0 | 0.0 |
2012 | 8755 | 0.0 | 0.0 | 0.0 |
2013 | 8596 | 0.0 | 0.0 | 0.0 |
2014 | 8529 | 0.0 | 0.0 | 0.0 |
2015 | 8691 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8745 | 0.0 | 0.0 | 0.0 |
2019 | 8562 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[5]