If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284250904002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.373766,"lon":-113.469633,"icon":""}]} |
Location: 00/04-09-028-25W4/2 | |
Location Alias: 00/04-09-28-25 W4M | |
Location Alias 2: 00/04-09-028-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 25 | |
Section: 09 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 4-9-28-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0299229 | |
License Date: 2003-12-17 | |
License Status: Issued | |
Spud Date: 2004-01-06 | |
Final Drill Date: 2004-01-07 | |
Well Total Depth: 721.00 m | |
Surface Hole Latitude: 51.373766 | |
Surface Hole Longitude: -113.469633 |
Date | Event |
---|---|
2003-12-17 | Obtained License |
2004-01-03 | Surface Casing Operation Performed |
2004-01-07 | Finished Drilling |
2004-01-07 | Production Casing Operation Performed |
2004-01-07 | Rig Released |
2004-01-07 | Well Mode changed to Drilled and Cased |
2004-02-01 | Well Log Performed |
2004-02-14 | Perforation Treatment Performed - Jet Perforation |
2004-05-03 | Perforation Treatment Performed - Fractured |
2006-07-06 | Perforation Treatment Performed - Jet Perforation |
2006-07-10 | Perforation Treatment Performed - Fractured |
2006-07-23 | Well Began Production |
2006-07-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-07-23 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-02-14 | Perforation | 575.00 | 578.00 | 13 |
2006-07-06 | Perforation | 551.50 | 552.00 | 13 |
2006-07-06 | Perforation | 549.70 | 550.20 | 13 |
2006-07-06 | Perforation | 541.70 | 542.70 | 13 |
2006-07-06 | Perforation | 535.90 | 536.40 | 13 |
2006-07-06 | Perforation | 529.20 | 529.70 | 13 |
2006-07-06 | Perforation | 527.10 | 528.10 | 13 |
2006-07-06 | Perforation | 499.80 | 500.30 | 13 |
2006-07-06 | Perforation | 498.60 | 499.10 | 13 |
2006-07-06 | Perforation | 484.00 | 484.50 | 13 |
2006-07-06 | Perforation | 479.00 | 480.00 | 13 |
2004-05-03 | Fracture | 575.00 | 578.00 | 0 |
2006-07-06 | Perforation | 450.10 | 450.60 | 13 |
2006-07-06 | Perforation | 445.80 | 446.30 | 13 |
2006-07-06 | Perforation | 441.80 | 442.30 | 13 |
2006-07-06 | Perforation | 439.00 | 439.50 | 13 |
2006-07-06 | Perforation | 424.00 | 424.50 | 13 |
2006-07-06 | Perforation | 422.90 | 423.40 | 13 |
2006-07-06 | Perforation | 382.50 | 383.00 | 13 |
2006-07-06 | Perforation | 372.90 | 373.40 | 13 |
2006-07-06 | Perforation | 366.70 | 367.20 | 13 |
2006-07-06 | Perforation | 333.60 | 334.10 | 13 |
2006-07-06 | Perforation | 609.20 | 609.70 | 13 |
2006-07-06 | Perforation | 328.40 | 328.90 | 13 |
2006-07-06 | Perforation | 324.20 | 324.70 | 13 |
2006-07-06 | Perforation | 318.10 | 318.60 | 13 |
2006-07-06 | Perforation | 315.50 | 316.00 | 13 |
2006-07-06 | Perforation | 310.90 | 311.40 | 13 |
2006-07-06 | Perforation | 305.00 | 305.50 | 13 |
2006-07-06 | Perforation | 243.80 | 244.30 | 13 |
2006-07-06 | Perforation | 203.40 | 203.90 | 13 |
2006-07-10 | Fracture | 203.40 | 609.70 | 0 |
2006-07-06 | Perforation | 606.20 | 606.70 | 13 |
2006-07-06 | Perforation | 599.20 | 599.70 | 13 |
2006-07-06 | Perforation | 581.90 | 582.40 | 13 |
2006-07-06 | Perforation | 567.00 | 567.50 | 13 |
2006-07-06 | Perforation | 564.80 | 565.30 | 13 |
2006-07-06 | Perforation | 560.00 | 560.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 3826 | 0.0 | 0.0 | 0.0 |
2007 | 8708 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8746 | 0.0 | 0.0 | 0.0 |
2011 | 8728 | 0.0 | 0.0 | 0.0 |
2012 | 8778 | 0.0 | 0.0 | 0.0 |
2013 | 8715 | 0.0 | 0.0 | 0.0 |
2014 | 8671 | 0.0 | 0.0 | 0.0 |
2015 | 8700 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8745 | 0.0 | 0.0 | 0.0 |
2019 | 8562 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[5]