X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284250904002

Well Details

Well ID: 0284250904002
Loading map...
Location: 00/04-09-028-25W4/2
Location Alias: 00/04-09-28-25 W4M
Location Alias 2: 00/04-09-028-25 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 09
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 4-9-28-25
Operator Name: Ember Resources Inc.
License Number: 0299229
License Date: 2003-12-17
License Status: Issued
Spud Date: 2004-01-06
Final Drill Date: 2004-01-07
Well Total Depth: 721.00 m
Surface Hole Latitude: 51.373766
Surface Hole Longitude: -113.469633

For data sources see[1][2]

Well History

Date Event
2003-12-17 Obtained License
2004-01-03 Surface Casing Operation Performed
2004-01-07 Finished Drilling
2004-01-07 Production Casing Operation Performed
2004-01-07 Rig Released
2004-01-07 Well Mode changed to Drilled and Cased
2004-02-01 Well Log Performed
2004-02-14 Perforation Treatment Performed - Jet Perforation
2004-05-03 Perforation Treatment Performed - Fractured
2006-07-06 Perforation Treatment Performed - Jet Perforation
2006-07-10 Perforation Treatment Performed - Fractured
2006-07-23 Well Began Production
2006-07-23 Well Fluid changed to Coalbed Methane-Coals and Other
2006-07-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-02-14 Perforation 575.00 578.00 13
2006-07-06 Perforation 551.50 552.00 13
2006-07-06 Perforation 549.70 550.20 13
2006-07-06 Perforation 541.70 542.70 13
2006-07-06 Perforation 535.90 536.40 13
2006-07-06 Perforation 529.20 529.70 13
2006-07-06 Perforation 527.10 528.10 13
2006-07-06 Perforation 499.80 500.30 13
2006-07-06 Perforation 498.60 499.10 13
2006-07-06 Perforation 484.00 484.50 13
2006-07-06 Perforation 479.00 480.00 13
2004-05-03 Fracture 575.00 578.00 0
2006-07-06 Perforation 450.10 450.60 13
2006-07-06 Perforation 445.80 446.30 13
2006-07-06 Perforation 441.80 442.30 13
2006-07-06 Perforation 439.00 439.50 13
2006-07-06 Perforation 424.00 424.50 13
2006-07-06 Perforation 422.90 423.40 13
2006-07-06 Perforation 382.50 383.00 13
2006-07-06 Perforation 372.90 373.40 13
2006-07-06 Perforation 366.70 367.20 13
2006-07-06 Perforation 333.60 334.10 13
2006-07-06 Perforation 609.20 609.70 13
2006-07-06 Perforation 328.40 328.90 13
2006-07-06 Perforation 324.20 324.70 13
2006-07-06 Perforation 318.10 318.60 13
2006-07-06 Perforation 315.50 316.00 13
2006-07-06 Perforation 310.90 311.40 13
2006-07-06 Perforation 305.00 305.50 13
2006-07-06 Perforation 243.80 244.30 13
2006-07-06 Perforation 203.40 203.90 13
2006-07-10 Fracture 203.40 609.70 0
2006-07-06 Perforation 606.20 606.70 13
2006-07-06 Perforation 599.20 599.70 13
2006-07-06 Perforation 581.90 582.40 13
2006-07-06 Perforation 567.00 567.50 13
2006-07-06 Perforation 564.80 565.30 13
2006-07-06 Perforation 560.00 560.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3826 0.0 0.0 0.0
2007 8708 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8746 0.0 0.0 0.0
2011 8728 0.0 0.0 0.0
2012 8778 0.0 0.0 0.0
2013 8715 0.0 0.0 0.0
2014 8671 0.0 0.0 0.0
2015 8700 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8745 0.0 0.0 0.0
2019 8562 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

References