X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284251002000

Well Details

Well ID: 0284251002000
Loading map...
Location: 00/02-10-028-25W4/0
Location Alias: 00/02-10-28-25 W4M
Location Alias 2: 00/02-10-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 10
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 2-10-28-25
Operator Name: Ember Resources Inc.
License Number: 0298809
License Date: 2003-12-15
License Status: Issued
Spud Date: 2004-01-03
Final Drill Date: 2004-01-04
Well Total Depth: 738.00 m
Surface Hole Latitude: 51.374151
Surface Hole Longitude: -113.438352

For data sources see[1][2]

Well History

Date Event
2003-12-15 Obtained License
2003-12-19 Surface Casing Operation Performed
2004-01-04 Finished Drilling
2004-01-04 Production Casing Operation Performed
2004-01-04 Rig Released
2004-01-04 Well Mode changed to Drilled and Cased
2004-02-01 Well Log Performed
2004-02-15 Perforation Treatment Performed - Jet Perforation
2004-08-30 Perforation Treatment Performed - Jet Perforation
2004-09-15 Perforation Treatment Performed - Fractured
2004-10-22 Well Began Production
2004-10-22 Well Fluid changed to Coalbed Methane-Coals and Other
2004-10-22 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-02-15 Perforation 419.00 422.00 13
2004-08-30 Perforation 326.90 327.90 13
2004-08-30 Perforation 370.30 371.30 13
2004-08-30 Perforation 376.40 377.40 13
2004-08-30 Perforation 428.00 429.00 13
2004-08-30 Perforation 429.00 430.00 13
2004-08-30 Perforation 438.30 439.30 13
2004-08-30 Perforation 447.10 448.10 13
2004-08-30 Perforation 451.50 452.50 13
2004-08-30 Perforation 457.10 458.10 13
2004-08-30 Perforation 473.70 474.70 13
2004-08-30 Perforation 191.80 192.80 13
2004-08-30 Perforation 478.40 479.40 13
2004-08-30 Perforation 484.50 485.50 13
2004-08-30 Perforation 495.40 496.40 13
2004-08-30 Perforation 497.50 498.50 13
2004-08-30 Perforation 502.80 503.80 13
2004-08-30 Perforation 531.60 532.60 13
2004-08-30 Perforation 537.40 538.40 13
2004-08-30 Perforation 546.80 547.80 13
2004-08-30 Perforation 551.80 552.80 13
2004-08-30 Perforation 554.10 555.10 13
2004-08-30 Perforation 193.20 194.20 13
2004-08-30 Perforation 555.70 556.70 13
2004-08-30 Perforation 563.20 564.20 13
2004-08-30 Perforation 569.10 570.10 13
2004-08-30 Perforation 573.80 574.80 13
2004-08-30 Perforation 583.40 584.40 13
2004-08-30 Perforation 606.00 607.00 13
2004-08-30 Perforation 607.00 608.00 13
2004-08-30 Perforation 609.10 610.10 13
2004-08-30 Perforation 612.90 613.90 13
2004-09-15 Fracture 191.80 532.60 0
2004-08-30 Perforation 207.00 208.00 13
2004-09-15 Fracture 546.80 613.90 0
2004-08-30 Perforation 247.50 248.50 13
2004-08-30 Perforation 307.50 308.50 13
2004-08-30 Perforation 313.20 314.20 13
2004-08-30 Perforation 316.30 317.30 13
2004-08-30 Perforation 319.50 320.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1704 0.0 0.0 0.0
2005 8653 0.0 0.0 0.0
2006 8685 0.0 0.0 0.0
2007 8708 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8746 0.0 0.0 0.0
2011 8728 0.0 0.0 0.0
2012 8778 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8671 0.0 0.0 0.0
2015 8699 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8745 0.0 0.0 0.0
2019 8562 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

References