X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284251009000

Well Details

Well ID: 0284251009000
Loading map...
Location: 00/09-10-028-25W4/0
Location Alias: 00/09-10-28-25 W4M
Location Alias 2: 00/09-10-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 10
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 9-10-28-25
Operator Name: Ember Resources Inc.
License Number: 0296792
License Date: 2003-11-24
License Status: Issued
Spud Date: 2003-12-01
Final Drill Date: 2003-12-02
Well Total Depth: 730.00 m
Surface Hole Latitude: 51.382647
Surface Hole Longitude: -113.430204

For data sources see[1][2]

Well History

Date Event
2003-11-24 Obtained License
2003-11-29 Surface Casing Operation Performed
2003-12-02 Finished Drilling
2003-12-02 Production Casing Operation Performed
2003-12-02 Rig Released
2003-12-02 Well Mode changed to Drilled and Cased
2003-12-21 Well Log Performed
2004-01-16 Perforation Treatment Performed - Jet Perforation
2004-02-04 Perforation Treatment Performed - Fractured
2004-07-21 Well Began Production
2004-07-21 Well Fluid changed to Coalbed Methane-Coals Only
2004-07-21 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-01-16 Perforation 202.20 203.20 13
2004-01-16 Perforation 438.90 439.90 13
2004-01-16 Perforation 444.10 445.10 13
2004-01-16 Perforation 449.00 450.00 13
2004-01-16 Perforation 455.20 456.20 13
2004-01-16 Perforation 458.70 459.70 13
2004-01-16 Perforation 477.00 478.00 13
2004-01-16 Perforation 481.40 482.40 13
2004-01-16 Perforation 486.30 487.30 13
2004-01-16 Perforation 497.70 498.70 13
2004-01-16 Perforation 503.90 504.90 13
2004-01-16 Perforation 205.80 206.80 13
2004-01-16 Perforation 527.90 528.90 13
2004-01-16 Perforation 536.80 537.80 13
2004-01-16 Perforation 543.90 544.90 13
2004-01-16 Perforation 553.00 554.00 13
2004-01-16 Perforation 554.90 555.90 13
2004-01-16 Perforation 557.00 558.00 13
2004-01-16 Perforation 565.10 566.10 13
2004-01-16 Perforation 570.90 571.90 13
2004-01-16 Perforation 573.40 574.40 13
2004-01-16 Perforation 583.20 584.20 13
2004-01-16 Perforation 208.50 209.50 13
2004-01-16 Perforation 584.80 585.80 13
2004-01-16 Perforation 603.00 604.30 13
2004-01-16 Perforation 611.50 612.50 13
2004-02-04 Fracture 202.20 612.50 0
2004-01-16 Perforation 312.80 313.80 13
2004-01-16 Perforation 315.50 316.50 13
2004-01-16 Perforation 324.70 325.70 13
2004-01-16 Perforation 372.30 373.30 13
2004-01-16 Perforation 377.60 378.60 13
2004-01-16 Perforation 428.80 429.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 3884 0.0 0.0 0.0
2005 8653 0.0 0.0 0.0
2006 8685 0.0 0.0 0.0
2007 8708 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8677 0.0 0.0 0.0
2011 8682 0.0 0.0 0.0
2012 8755 0.0 0.0 0.0
2013 8596 0.0 0.0 0.0
2014 8529 0.0 0.0 0.0
2015 8692 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8745 0.0 0.0 0.0
2019 8562 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

References