If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284251208000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.377953,"lon":-113.382409,"icon":""}]} |
Location: 00/08-12-028-25W4/0 | |
Location Alias: 00/08-12-28-25 W4M | |
Location Alias 2: 00/08-12-028-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 25 | |
Section: 12 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 8-12-28-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0393699 | |
License Date: 2008-02-06 | |
License Status: Issued | |
Spud Date: 2008-10-09 | |
Final Drill Date: 2008-10-16 | |
Well Total Depth: 932.00 m | |
Surface Hole Latitude: 51.377953 | |
Surface Hole Longitude: -113.382409 |
Date | Event |
---|---|
2008-02-06 | Obtained License |
2008-10-09 | Surface Casing Operation Performed |
2008-10-16 | Finished Drilling |
2008-10-16 | Production Casing Operation Performed |
2008-10-16 | Rig Released |
2008-10-16 | Well Mode changed to Drilled and Cased |
2008-10-21 | Well Log Performed |
2008-11-12 | Perforation Treatment Performed - Jet Perforation |
2008-11-29 | Perforation Treatment Performed - Fractured |
2008-12-06 | Well Fluid changed to Gas |
2008-12-06 | Well Mode changed to Testing |
2009-01-08 | Perforation Treatment Performed - Jet Perforation |
2009-01-18 | Perforation Treatment Performed - Jet Perforation |
2009-02-02 | Perforation Treatment Performed - Fractured |
2009-02-23 | Perforation Treatment Performed - Jet Perforation |
2009-02-26 | Perforation Treatment Performed - Fractured |
2009-03-16 | Well Began Production |
2009-03-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-03-16 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-11-12 | Perforation | 727.50 | 729.50 | 13 |
2009-02-23 | Perforation | 411.10 | 411.60 | 13 |
2009-02-23 | Perforation | 403.80 | 404.80 | 13 |
2009-02-23 | Perforation | 289.70 | 290.20 | 13 |
2009-02-23 | Perforation | 393.00 | 395.00 | 13 |
2009-02-23 | Perforation | 323.00 | 325.00 | 13 |
2009-02-23 | Perforation | 319.00 | 321.00 | 13 |
2009-02-23 | Perforation | 281.60 | 282.10 | 13 |
2009-02-23 | Perforation | 279.00 | 279.50 | 13 |
2009-02-23 | Perforation | 212.50 | 213.00 | 13 |
2009-02-23 | Perforation | 521.70 | 522.20 | 13 |
2008-11-29 | Fracture | 727.50 | 729.50 | 0 |
2009-02-23 | Perforation | 516.50 | 517.00 | 13 |
2009-02-23 | Perforation | 509.20 | 510.20 | 13 |
2009-02-23 | Perforation | 558.10 | 559.10 | 13 |
2009-02-23 | Perforation | 541.60 | 542.10 | 13 |
2009-02-23 | Perforation | 527.50 | 528.00 | 13 |
2009-02-23 | Perforation | 503.20 | 503.70 | 13 |
2009-02-23 | Perforation | 434.20 | 434.70 | 13 |
2009-02-23 | Perforation | 442.70 | 443.20 | 13 |
2009-02-23 | Perforation | 437.40 | 438.40 | 13 |
2009-02-23 | Perforation | 497.20 | 497.70 | 13 |
2009-01-08 | Perforation | 533.00 | 535.00 | 13 |
2009-02-23 | Perforation | 489.90 | 490.40 | 13 |
2009-02-23 | Perforation | 453.30 | 456.30 | 13 |
2009-02-26 | Fracture | 319.00 | 395.00 | 0 |
2009-02-26 | Fracture | 212.50 | 559.10 | 0 |
2009-01-18 | Perforation | 485.00 | 488.00 | 13 |
2009-02-02 | Fracture | 485.00 | 488.00 | 0 |
2009-02-23 | Perforation | 397.00 | 397.50 | 13 |
2009-02-23 | Perforation | 384.00 | 386.00 | 13 |
2009-02-23 | Perforation | 374.00 | 374.50 | 13 |
2009-02-23 | Perforation | 417.10 | 417.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 6984 | 0.0 | 0.0 | 0.0 |
2010 | 8718 | 0.0 | 0.0 | 0.0 |
2011 | 8726 | 0.0 | 0.0 | 0.0 |
2012 | 4920 | 0.0 | 0.0 | 0.0 |
2013 | 8481 | 0.0 | 0.0 | 0.0 |
2014 | 8663 | 0.0 | 0.0 | 0.0 |
2015 | 8756 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8641 | 0.0 | 0.0 | 0.0 |
2018 | 8389 | 0.0 | 0.0 | 0.0 |
2019 | 8474 | 0.0 | 0.0 | 0.0 |
2020 | 2075 | 0.0 | 0.0 | 0.0 |
For data sources see[5]