If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284251214000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.384685,"lon":-113.392886,"icon":""}]} |
Location: 00/14-12-028-25W4/0 | |
Location Alias: 00/14-12-28-25 W4M | |
Location Alias 2: 00/14-12-028-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 25 | |
Section: 12 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 14-12-28-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0422388 | |
License Date: 2010-08-05 | |
License Status: Issued | |
Spud Date: 2010-11-15 | |
Final Drill Date: 2010-11-17 | |
Well Total Depth: 946.00 m | |
Surface Hole Latitude: 51.384685 | |
Surface Hole Longitude: -113.392886 |
Date | Event |
---|---|
2010-08-05 | Obtained License |
2010-11-15 | Surface Casing Operation Performed |
2010-11-17 | Finished Drilling |
2010-11-17 | Well Log Performed |
2010-11-17 | Well Mode changed to Drilled and Cased |
2010-11-18 | Production Casing Operation Performed |
2010-11-18 | Rig Released |
2010-11-21 | Well Log Performed |
2010-11-25 | Well Log Performed |
2011-01-05 | Perforation Treatment Performed - Jet Perforation |
2011-02-19 | Perforation Treatment Performed - Fractured |
2011-02-22 | Well Fluid changed to Gas |
2011-02-22 | Well Mode changed to Testing |
2011-03-08 | Perforation Treatment Performed - Jet Perforation |
2011-04-08 | Well Began Production |
2011-04-08 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-04-08 | Well Mode changed to Flowing |
2011-06-04 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-05 | Perforation | 868.00 | 870.00 | 13 |
2011-02-19 | Fracture | 496.00 | 498.00 | 0 |
2011-02-19 | Fracture | 310.50 | 312.50 | 0 |
2011-03-08 | Perforation | 564.10 | 565.10 | 13 |
2011-03-08 | Perforation | 547.80 | 548.30 | 13 |
2011-03-08 | Perforation | 543.70 | 544.20 | 13 |
2011-03-08 | Perforation | 537.70 | 538.20 | 13 |
2011-03-08 | Perforation | 531.30 | 532.30 | 13 |
2011-03-08 | Perforation | 526.80 | 527.80 | 13 |
2011-03-08 | Perforation | 519.60 | 520.60 | 13 |
2011-03-08 | Perforation | 512.00 | 513.00 | 13 |
2011-01-05 | Perforation | 751.00 | 753.00 | 13 |
2011-03-08 | Perforation | 506.60 | 507.60 | 13 |
2011-03-08 | Perforation | 499.00 | 500.00 | 13 |
2011-03-08 | Perforation | 463.20 | 464.70 | 13 |
2011-03-08 | Perforation | 462.30 | 462.80 | 13 |
2011-03-08 | Perforation | 461.10 | 461.60 | 13 |
2011-03-08 | Perforation | 460.40 | 460.90 | 13 |
2011-03-08 | Perforation | 451.00 | 451.50 | 13 |
2011-03-08 | Perforation | 445.70 | 447.70 | 13 |
2011-03-08 | Perforation | 441.70 | 442.70 | 13 |
2011-03-08 | Perforation | 433.20 | 433.70 | 13 |
2011-01-05 | Perforation | 730.00 | 732.00 | 13 |
2011-03-08 | Perforation | 424.20 | 425.20 | 13 |
2011-03-08 | Perforation | 415.20 | 415.70 | 13 |
2011-03-08 | Perforation | 392.10 | 395.60 | 13 |
2011-03-08 | Perforation | 284.80 | 285.30 | 13 |
2011-03-08 | Perforation | 283.10 | 283.60 | 13 |
2011-03-08 | Perforation | 216.60 | 217.10 | 13 |
2011-03-08 | Perforation | 468.00 | 469.50 | 13 |
2011-03-08 | Perforation | 407.00 | 408.50 | 13 |
2011-03-08 | Perforation | 403.00 | 405.50 | 13 |
2011-03-08 | Perforation | 397.00 | 398.00 | 13 |
2011-01-05 | Perforation | 646.50 | 648.50 | 13 |
2011-03-08 | Perforation | 367.50 | 369.00 | 13 |
2011-03-08 | Perforation | 332.00 | 334.50 | 13 |
2011-03-08 | Perforation | 319.50 | 320.50 | 13 |
2011-03-08 | Perforation | 249.50 | 251.50 | 13 |
2011-03-08 | Perforation | 238.00 | 241.00 | 13 |
2011-03-08 | Perforation | 223.00 | 225.50 | 13 |
2011-03-08 | Perforation | 215.00 | 216.50 | 13 |
2011-06-04 | Fracture | 216.60 | 217.10 | 0 |
2011-06-04 | Fracture | 283.10 | 285.30 | 0 |
2011-06-04 | Fracture | 392.10 | 395.60 | 0 |
2011-01-05 | Perforation | 610.00 | 612.00 | 13 |
2011-06-04 | Fracture | 415.20 | 464.70 | 0 |
2011-06-04 | Fracture | 499.00 | 548.30 | 0 |
2011-06-04 | Fracture | 564.10 | 565.10 | 0 |
2011-06-04 | Fracture | 215.00 | 216.50 | 0 |
2011-06-04 | Fracture | 223.00 | 251.50 | 0 |
2011-06-04 | Fracture | 319.50 | 369.00 | 0 |
2011-06-04 | Fracture | 468.00 | 469.50 | 0 |
2011-01-05 | Perforation | 496.00 | 498.00 | 13 |
2011-01-05 | Perforation | 310.50 | 312.50 | 13 |
2011-02-19 | Fracture | 868.00 | 870.00 | 0 |
2011-02-19 | Fracture | 751.00 | 753.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5980 | 0.0 | 0.0 | 0.0 |
2012 | 8755 | 0.0 | 0.0 | 0.0 |
2013 | 8603 | 0.0 | 0.0 | 0.0 |
2014 | 8529 | 0.0 | 0.0 | 0.0 |
2015 | 8691 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8745 | 0.0 | 0.0 | 0.0 |
2019 | 8562 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[5]