If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284251506002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.393917,"lon":-113.441725,"icon":""}]} |
| Location: 00/06-15-028-25W4/2 | |
| Location Alias: 00/06-15-28-25 W4M | |
| Location Alias 2: 00/06-15-028-25 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 15 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 6-15-28-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0290474 | |
| License Date: 2003-07-25 | |
| License Status: Issued | |
| Spud Date: 2003-09-02 | |
| Final Drill Date: 2003-09-03 | |
| Well Total Depth: 730.00 m | |
| Surface Hole Latitude: 51.393917 | |
| Surface Hole Longitude: -113.441725 |
| Date | Event |
|---|---|
| 2003-07-25 | Obtained License |
| 2003-07-26 | Surface Casing Operation Performed |
| 2003-09-03 | Finished Drilling |
| 2003-09-03 | Production Casing Operation Performed |
| 2003-09-03 | Rig Released |
| 2003-09-03 | Well Mode changed to Drilled and Cased |
| 2003-09-14 | Well Log Performed |
| 2003-10-10 | Well Log Performed |
| 2003-11-05 | Perforation Treatment Performed - Jet Perforation |
| 2004-01-16 | Perforation Treatment Performed - Fractured |
| 2005-02-09 | Perforation Treatment Performed - Jet Perforation |
| 2005-02-15 | Perforation Treatment Performed - Fractured |
| 2005-02-18 | Well Began Production |
| 2005-02-18 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2005-02-18 | Well Mode changed to Flowing |
| 2017-04-24 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2017-04-24 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2003-11-05 | Perforation | 671.00 | 675.00 | 13 |
| 2005-02-09 | Perforation | 550.10 | 550.60 | 13 |
| 2005-02-09 | Perforation | 542.20 | 542.70 | 13 |
| 2005-02-09 | Perforation | 535.50 | 536.00 | 13 |
| 2005-02-09 | Perforation | 502.60 | 503.10 | 13 |
| 2005-02-09 | Perforation | 478.20 | 478.70 | 13 |
| 2005-02-09 | Perforation | 473.40 | 473.90 | 13 |
| 2005-02-09 | Perforation | 454.60 | 455.10 | 13 |
| 2005-02-09 | Perforation | 445.10 | 445.60 | 13 |
| 2005-02-09 | Perforation | 441.40 | 441.90 | 13 |
| 2005-02-09 | Perforation | 426.40 | 426.90 | 13 |
| 2004-01-16 | Fracture | 671.00 | 675.00 | 0 |
| 2005-02-09 | Perforation | 375.20 | 375.70 | 13 |
| 2005-02-09 | Perforation | 324.00 | 324.50 | 13 |
| 2005-02-09 | Perforation | 316.30 | 316.80 | 13 |
| 2005-02-09 | Perforation | 205.10 | 205.60 | 13 |
| 2005-02-09 | Perforation | 193.70 | 194.20 | 13 |
| 2005-02-09 | Perforation | 179.30 | 179.80 | 13 |
| 2005-02-15 | Fracture | 179.30 | 602.00 | 0 |
| 2005-02-09 | Perforation | 601.50 | 602.00 | 13 |
| 2005-02-09 | Perforation | 583.60 | 584.10 | 13 |
| 2005-02-09 | Perforation | 573.00 | 573.50 | 13 |
| 2005-02-09 | Perforation | 570.60 | 571.10 | 13 |
| 2005-02-09 | Perforation | 565.40 | 565.90 | 13 |
| 2005-02-09 | Perforation | 555.40 | 555.90 | 13 |
| 2005-02-09 | Perforation | 553.50 | 554.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 336 | 0.0 | 0.0 | 0.0 |
| 2007 | 8708 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8677 | 0.0 | 0.0 | 0.0 |
| 2011 | 8682 | 0.0 | 0.0 | 0.0 |
| 2012 | 8755 | 0.0 | 0.0 | 0.0 |
| 2013 | 8596 | 0.0 | 0.0 | 0.0 |
| 2014 | 8529 | 0.0 | 0.0 | 0.0 |
| 2015 | 8691 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8745 | 0.0 | 0.0 | 0.0 |
| 2019 | 8562 | 0.0 | 0.0 | 0.0 |
| 2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[5]