X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284251802000

Well Details

Well ID: 0284251802000
Loading map...
Location: 00/02-18-028-25W4/0
Location Alias: 00/02-18-28-25 W4M
Location Alias 2: 00/02-18-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 18
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 2-18-28-25
Operator Name: Ember Resources Inc.
License Number: 0301203
License Date: 2004-01-12
License Status: Issued
Spud Date: 2004-01-25
Final Drill Date: 2004-01-25
Well Total Depth: 725.00 m
Surface Hole Latitude: 51.389921
Surface Hole Longitude: -113.506766

For data sources see[1][2]

Well History

Date Event
2004-01-12 Obtained License
2004-01-21 Surface Casing Operation Performed
2004-01-25 Finished Drilling
2004-01-25 Production Casing Operation Performed
2004-01-25 Well Mode changed to Drilled and Cased
2004-01-26 Rig Released
2004-02-23 Well Log Performed
2004-05-27 Perforation Treatment Performed - Jet Perforation
2004-06-01 Perforation Treatment Performed - Fractured
2004-08-27 Well Began Production
2004-08-27 Well Fluid changed to Coalbed Methane-Coals Only
2004-08-27 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-05-27 Perforation 614.30 615.30 13
2004-05-27 Perforation 548.30 549.30 13
2004-05-27 Perforation 541.10 542.10 13
2004-05-27 Perforation 517.50 518.50 13
2004-05-27 Perforation 507.30 508.30 13
2004-05-27 Perforation 493.00 494.00 13
2004-05-27 Perforation 487.00 488.00 13
2004-05-27 Perforation 469.30 470.30 13
2004-05-27 Perforation 457.40 458.40 13
2004-05-27 Perforation 454.00 455.00 13
2004-05-27 Perforation 438.70 440.70 13
2004-05-27 Perforation 608.00 610.00 13
2004-05-27 Perforation 387.80 388.80 13
2004-05-27 Perforation 343.60 344.60 13
2004-05-27 Perforation 338.40 339.40 13
2004-05-27 Perforation 329.10 330.10 13
2004-05-27 Perforation 326.10 327.10 13
2004-05-27 Perforation 258.50 259.50 13
2004-05-27 Perforation 217.30 218.30 13
2004-05-27 Perforation 210.50 211.50 13
2004-05-27 Perforation 203.90 204.90 13
2004-05-27 Perforation 201.80 202.80 13
2004-05-27 Perforation 594.10 595.10 13
2004-06-01 Fracture 201.80 615.30 0
2004-05-27 Perforation 582.20 583.20 13
2004-05-27 Perforation 579.40 580.40 13
2004-05-27 Perforation 575.20 576.20 13
2004-05-27 Perforation 565.80 566.80 13
2004-05-27 Perforation 552.90 553.90 13
2004-05-27 Perforation 549.90 550.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 3034 0.0 0.0 0.0
2005 8528 0.0 0.0 0.0
2006 8685 0.0 0.0 0.0
2007 8708 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8677 0.0 0.0 0.0
2011 8682 0.0 0.0 0.0
2012 8755 0.0 0.0 0.0
2013 8596 0.0 0.0 0.0
2014 8529 0.0 0.0 0.0
2015 8691 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8745 0.0 0.0 0.0
2019 8562 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

References