X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284251912002

Well Details

Well ID: 0284251912002
Loading map...
Location: 00/12-19-028-25W4/2
Location Alias: 00/12-19-28-25 W4M
Location Alias 2: 00/12-19-028-25 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 19
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 12-19-28-25
Operator Name: Ember Resources Inc.
License Number: 0338891
License Date: 2005-09-28
License Status: Issued
Spud Date: 2005-11-14
Final Drill Date: 2005-11-30
Well Total Depth: 1001.00 m
Surface Hole Latitude: 51.410559
Surface Hole Longitude: -113.517687

For data sources see[1][2]

Well History

Date Event
2005-09-28 Obtained License
2005-11-15 Surface Casing Operation Performed
2005-11-30 Finished Drilling
2005-11-30 Production Casing Operation Performed
2005-11-30 Rig Released
2005-11-30 Well Mode changed to Drilled and Cased
2005-12-07 Well Log Performed
2005-12-21 Perforation Treatment Performed - Jet Perforation
2006-02-08 Perforation Treatment Performed - Jet Perforation
2006-02-09 Perforation Treatment Performed - Fractured
2006-02-24 Well Began Production
2006-02-24 Well Fluid changed to Coalbed Methane-Coals and Other
2006-02-24 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-21 Perforation 676.00 678.00 13
2006-02-08 Perforation 608.40 608.90 13
2006-02-08 Perforation 599.90 600.40 13
2006-02-08 Perforation 596.10 596.60 13
2006-02-08 Perforation 588.80 589.30 13
2006-02-08 Perforation 579.20 579.70 13
2006-02-08 Perforation 567.20 567.70 13
2006-02-08 Perforation 562.70 563.20 13
2006-02-08 Perforation 554.50 555.00 13
2006-02-08 Perforation 553.40 553.90 13
2006-02-08 Perforation 526.30 526.80 13
2006-02-08 Perforation 926.20 926.70 13
2006-02-08 Perforation 525.30 525.80 13
2006-02-08 Perforation 522.30 522.80 13
2006-02-08 Perforation 507.50 508.00 13
2006-02-08 Perforation 505.70 506.20 13
2006-02-08 Perforation 500.40 500.90 13
2006-02-08 Perforation 480.50 481.00 13
2006-02-08 Perforation 474.20 474.70 13
2006-02-08 Perforation 470.00 470.50 13
2006-02-08 Perforation 466.70 467.20 13
2006-02-08 Perforation 452.50 453.50 13
2006-02-08 Perforation 911.40 911.90 13
2006-02-08 Perforation 452.00 452.50 13
2006-02-08 Perforation 397.50 398.00 13
2006-02-08 Perforation 346.60 347.10 13
2006-02-08 Perforation 338.20 338.70 13
2006-02-08 Perforation 334.00 334.50 13
2006-02-08 Perforation 269.20 269.70 13
2006-02-09 Fracture 269.20 926.70 0
2006-02-08 Perforation 897.60 898.10 13
2006-02-08 Perforation 793.60 794.30 13
2006-02-08 Perforation 758.40 758.90 13
2006-02-08 Perforation 748.60 749.10 13
2006-02-08 Perforation 617.90 618.90 13
2006-02-08 Perforation 609.20 609.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 7423 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References