If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284252016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.414645,"lon":-113.476083,"icon":""}]} |
Location: 00/16-20-028-25W4/0 | |
Location Alias: 00/16-20-28-25 W4M | |
Location Alias 2: 00/16-20-028-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 25 | |
Section: 20 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 16-20-28-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0293700 | |
License Date: 2003-09-24 | |
License Status: Issued | |
Spud Date: 2003-10-02 | |
Final Drill Date: 2003-10-03 | |
Well Total Depth: 732.00 m | |
Surface Hole Latitude: 51.414645 | |
Surface Hole Longitude: -113.476083 |
Date | Event |
---|---|
2003-09-24 | Obtained License |
2003-09-30 | Conductor Casing Operation Performed |
2003-10-03 | Finished Drilling |
2003-10-03 | Production Casing Operation Performed |
2003-10-03 | Rig Released |
2003-10-03 | Well Mode changed to Drilled and Cased |
2003-10-11 | Well Log Performed |
2003-11-30 | Perforation Treatment Performed - Jet Perforation |
2004-02-15 | Perforation Treatment Performed - Fractured |
2004-02-19 | Well Fluid changed to Gas |
2004-02-19 | Well Mode changed to Testing |
2004-05-03 | Well Began Production |
2004-05-03 | Well Fluid changed to Gas |
2004-05-03 | Well Mode changed to Flowing |
2005-01-29 | Perforation Treatment Performed - Jet Perforation |
2005-01-31 | Perforation Treatment Performed - Fractured |
2005-02-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-02-03 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-11-30 | Perforation | 593.00 | 597.00 | 13 |
2005-01-29 | Perforation | 579.60 | 580.10 | 13 |
2005-01-29 | Perforation | 569.30 | 569.80 | 13 |
2005-01-29 | Perforation | 559.60 | 560.10 | 13 |
2005-01-29 | Perforation | 554.90 | 555.40 | 13 |
2005-01-29 | Perforation | 547.70 | 548.20 | 13 |
2005-01-29 | Perforation | 545.40 | 545.90 | 13 |
2005-01-29 | Perforation | 524.70 | 525.20 | 13 |
2005-01-29 | Perforation | 514.60 | 515.10 | 13 |
2005-01-29 | Perforation | 504.50 | 505.00 | 13 |
2005-01-29 | Perforation | 498.90 | 499.40 | 13 |
2004-02-15 | Fracture | 593.00 | 597.00 | 0 |
2005-01-29 | Perforation | 473.10 | 473.60 | 13 |
2005-01-29 | Perforation | 463.40 | 463.90 | 13 |
2005-01-29 | Perforation | 461.50 | 462.00 | 13 |
2005-01-29 | Perforation | 449.40 | 449.90 | 13 |
2005-01-29 | Perforation | 350.40 | 350.90 | 13 |
2005-01-29 | Perforation | 330.10 | 330.60 | 13 |
2005-01-29 | Perforation | 264.90 | 265.40 | 13 |
2005-01-29 | Perforation | 220.10 | 220.60 | 13 |
2005-01-29 | Perforation | 213.30 | 213.80 | 13 |
2005-01-29 | Perforation | 211.40 | 211.90 | 13 |
2005-01-29 | Perforation | 626.90 | 627.40 | 13 |
2005-01-29 | Perforation | 204.10 | 204.60 | 13 |
2005-01-29 | Perforation | 197.10 | 197.60 | 13 |
2005-01-31 | Fracture | 197.10 | 627.40 | 0 |
2005-01-29 | Perforation | 619.90 | 620.40 | 13 |
2005-01-29 | Perforation | 617.30 | 617.80 | 13 |
2005-01-29 | Perforation | 615.50 | 616.00 | 13 |
2005-01-29 | Perforation | 613.80 | 614.30 | 13 |
2005-01-29 | Perforation | 587.80 | 588.30 | 13 |
2005-01-29 | Perforation | 586.80 | 587.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 5758 | 0.0 | 0.0 | 0.0 |
2005 | 8559 | 0.0 | 0.0 | 0.0 |
2006 | 8728 | 0.0 | 0.0 | 0.0 |
2007 | 8615 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8382 | 0.0 | 0.0 | 0.0 |
2011 | 8673 | 0.0 | 0.0 | 0.0 |
2012 | 8762 | 0.0 | 0.0 | 0.0 |
2013 | 8720 | 0.0 | 0.0 | 0.0 |
2014 | 8594 | 0.0 | 0.0 | 0.0 |
2015 | 8685 | 0.0 | 0.0 | 0.0 |
2016 | 8600 | 0.0 | 0.0 | 0.0 |
2017 | 8575 | 0.0 | 0.0 | 0.0 |
2018 | 8671 | 0.0 | 0.0 | 0.0 |
2019 | 8507 | 0.0 | 0.0 | 0.0 |
2020 | 2128 | 0.0 | 0.0 | 0.0 |
For data sources see[5]