If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284252112002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.410182,"lon":-113.471692,"icon":""}]} |
Location: 00/12-21-028-25W4/2 | |
Location Alias: 00/12-21-28-25 W4M | |
Location Alias 2: 00/12-21-028-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 25 | |
Section: 21 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 12-21-28-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0324074 | |
License Date: 2005-01-12 | |
License Status: Issued | |
Spud Date: 2005-02-08 | |
Final Drill Date: 2005-02-09 | |
Well Total Depth: 738.00 m | |
Surface Hole Latitude: 51.410182 | |
Surface Hole Longitude: -113.471692 |
Date | Event |
---|---|
2005-01-12 | Obtained License |
2005-02-09 | Finished Drilling |
2005-02-09 | Surface Casing Operation Performed |
2005-02-09 | Well Log Performed |
2005-02-09 | Well Mode changed to Drilled and Cased |
2005-02-10 | Production Casing Operation Performed |
2005-02-10 | Rig Released |
2005-02-14 | Well Log Performed |
2005-03-03 | Perforation Treatment Performed - Jet Perforation |
2005-03-25 | Perforation Treatment Performed - Fractured |
2005-05-09 | Perforation Treatment Performed - Jet Perforation |
2005-05-14 | Perforation Treatment Performed - Fractured |
2005-05-27 | Well Began Production |
2005-05-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-05-27 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-03-03 | Perforation | 597.00 | 600.00 | 14 |
2005-05-09 | Perforation | 583.10 | 583.60 | 13 |
2005-05-09 | Perforation | 572.60 | 573.10 | 13 |
2005-05-09 | Perforation | 563.40 | 563.90 | 13 |
2005-05-09 | Perforation | 558.10 | 558.60 | 13 |
2005-05-09 | Perforation | 550.80 | 551.30 | 13 |
2005-05-09 | Perforation | 548.60 | 549.10 | 13 |
2005-05-09 | Perforation | 522.40 | 522.90 | 13 |
2005-05-09 | Perforation | 517.50 | 518.00 | 13 |
2005-05-09 | Perforation | 505.00 | 505.50 | 13 |
2005-05-09 | Perforation | 500.10 | 500.60 | 13 |
2005-03-25 | Fracture | 597.00 | 600.00 | 0 |
2005-05-09 | Perforation | 475.10 | 475.60 | 13 |
2005-05-09 | Perforation | 467.30 | 467.80 | 13 |
2005-05-09 | Perforation | 463.70 | 464.20 | 13 |
2005-05-09 | Perforation | 451.10 | 451.60 | 13 |
2005-05-09 | Perforation | 449.70 | 450.20 | 13 |
2005-05-09 | Perforation | 345.20 | 345.70 | 13 |
2005-05-09 | Perforation | 329.90 | 330.40 | 13 |
2005-05-09 | Perforation | 263.20 | 263.70 | 13 |
2005-05-09 | Perforation | 217.60 | 218.10 | 13 |
2005-05-09 | Perforation | 208.50 | 209.00 | 13 |
2005-05-09 | Perforation | 618.90 | 619.40 | 13 |
2005-05-09 | Perforation | 206.10 | 206.60 | 13 |
2005-05-09 | Perforation | 201.10 | 201.60 | 13 |
2005-05-14 | Fracture | 201.10 | 619.40 | 0 |
2005-05-09 | Perforation | 618.00 | 618.50 | 13 |
2005-05-09 | Perforation | 615.50 | 616.00 | 13 |
2005-05-09 | Perforation | 604.30 | 604.80 | 13 |
2005-05-09 | Perforation | 602.20 | 602.70 | 13 |
2005-05-09 | Perforation | 591.50 | 592.00 | 13 |
2005-05-09 | Perforation | 590.40 | 590.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 5183 | 0.0 | 0.0 | 0.0 |
2006 | 8685 | 0.0 | 0.0 | 0.0 |
2007 | 8708 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8677 | 0.0 | 0.0 | 0.0 |
2011 | 8370 | 0.0 | 0.0 | 0.0 |
2012 | 8755 | 0.0 | 0.0 | 0.0 |
2013 | 8596 | 0.0 | 0.0 | 0.0 |
2014 | 8529 | 0.0 | 0.0 | 0.0 |
2015 | 7971 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8745 | 0.0 | 0.0 | 0.0 |
2019 | 8562 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[5]