X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284252516000

Well Details

Well ID: 0284252516000
Loading map...
Location: 00/16-25-028-25W4/0
Location Alias: 00/16-25-28-25 W4M
Location Alias 2: 00/16-25-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 25
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 16-25-28-25
Operator Name: Ember Resources Inc.
License Number: 0218482
License Date: 1998-11-05
License Status: Issued
Spud Date: 1998-11-08
Final Drill Date: 1998-11-20
Well Total Depth: 989.00 m
Surface Hole Latitude: 51.428573
Surface Hole Longitude: -113.381154

For data sources see[1][2]

Well History

Date Event
1998-11-05 Obtained License
1998-11-08 Surface Casing Operation Performed
1998-11-20 Finished Drilling
1998-11-20 Production Casing Operation Performed
1998-11-20 Rig Released
1998-11-20 Well Mode changed to Drilled and Cased
1998-11-27 Well Log Performed
1999-02-02 Perforation Treatment Performed - Jet Perforation
1999-03-01 Well Fluid changed to Gas
1999-03-01 Well Mode changed to Testing
2002-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-10 Plug Back Performed
2002-09-10 Well Fluid changed to Gas
2002-09-10 Well Mode changed to Abandoned Zone
2002-09-14 Perforation Treatment Performed - Jet Perforation
2002-12-05 Perforation Treatment Performed - Jet Perforation
2003-06-03 Perforation Treatment Performed - Jet Perforation
2003-07-03 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-02-02 Perforation 697.00 700.00 7
2003-06-03 Perforation 553.30 554.30 13
2003-06-03 Perforation 547.30 548.30 13
2003-06-03 Perforation 539.90 540.90 13
2003-06-03 Perforation 533.70 534.70 13
2003-06-03 Perforation 528.40 529.40 13
2003-06-03 Perforation 520.10 521.10 13
2003-06-03 Perforation 492.70 493.70 13
2003-06-03 Perforation 486.40 487.40 13
2003-06-03 Perforation 475.20 476.20 13
2003-06-03 Perforation 473.30 474.30 13
2002-09-10 Packing Device Capped w/Cement 682.00 690.00 0
2003-06-03 Perforation 470.20 471.20 13
2003-06-03 Perforation 468.00 469.00 13
2003-06-03 Perforation 464.20 466.20 13
2003-06-03 Perforation 439.20 440.20 13
2003-06-03 Perforation 432.70 433.70 13
2003-06-03 Perforation 429.00 430.00 13
2003-06-03 Perforation 421.30 422.30 13
2003-06-03 Perforation 412.90 414.90 13
2003-06-03 Perforation 354.20 355.20 13
2003-06-03 Perforation 318.10 319.10 13
2002-09-14 Perforation 455.00 461.00 7
2003-06-03 Perforation 314.10 315.10 13
2003-06-03 Perforation 299.40 300.40 13
2003-06-03 Perforation 288.00 289.00 13
2003-06-03 Perforation 237.40 238.40 13
2003-06-03 Perforation 193.20 194.20 13
2003-07-03 Fracture 193.20 589.30 0
2002-12-05 Perforation 406.50 408.50 13
2002-12-05 Perforation 404.50 406.50 13
2003-06-03 Perforation 588.30 589.30 13
2003-06-03 Perforation 585.40 586.40 13
2003-06-03 Perforation 567.80 568.80 13
2003-06-03 Perforation 560.60 561.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 12 0.0 0.0 0.0

For data sources see[5]

References