If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284252609000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.425435,"lon":-113.404768,"icon":""}]} |
Location: 00/09-26-028-25W4/0 | |
Location Alias: 00/09-26-28-25 W4M | |
Location Alias 2: 00/09-26-028-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 25 | |
Section: 26 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 9-26-28-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0422066 | |
License Date: 2010-07-22 | |
License Status: Amended | |
Spud Date: 2010-10-18 | |
Final Drill Date: 2010-11-06 | |
Well Total Depth: 686.00 m | |
Surface Hole Latitude: 51.425435 | |
Surface Hole Longitude: -113.404768 |
Date | Event |
---|---|
2010-07-22 | Obtained License |
2010-10-18 | Surface Casing Operation Performed |
2010-11-06 | Finished Drilling |
2010-11-06 | Production Casing Operation Performed |
2010-11-06 | Rig Released |
2010-11-06 | Well Mode changed to Drilled and Cased |
2010-11-11 | Well Log Performed |
2010-12-22 | Perforation Treatment Performed - Jet Perforation |
2011-01-21 | Perforation Treatment Performed - Fractured |
2011-01-25 | Well Fluid changed to Gas |
2011-01-25 | Well Mode changed to Testing |
2011-02-06 | Perforation Treatment Performed - Jet Perforation |
2011-02-13 | Perforation Treatment Performed - Fractured |
2011-03-03 | Well Began Production |
2011-03-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-03 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-22 | Perforation | 460.50 | 462.50 | 13 |
2011-02-06 | Perforation | 537.30 | 537.80 | 13 |
2011-02-06 | Perforation | 544.60 | 545.10 | 13 |
2011-02-06 | Perforation | 520.50 | 521.00 | 13 |
2011-02-06 | Perforation | 524.10 | 525.10 | 13 |
2011-02-06 | Perforation | 379.80 | 380.30 | 13 |
2011-02-06 | Perforation | 407.10 | 407.60 | 13 |
2011-02-06 | Perforation | 324.80 | 325.30 | 13 |
2011-02-06 | Perforation | 361.80 | 362.30 | 13 |
2011-02-06 | Perforation | 419.40 | 420.40 | 13 |
2011-02-06 | Perforation | 444.10 | 444.60 | 13 |
2010-12-22 | Perforation | 386.00 | 388.00 | 13 |
2011-02-06 | Perforation | 464.80 | 465.30 | 13 |
2011-02-06 | Perforation | 434.90 | 435.90 | 13 |
2011-02-06 | Perforation | 437.40 | 437.90 | 13 |
2011-02-06 | Perforation | 545.60 | 546.10 | 13 |
2011-02-06 | Perforation | 230.50 | 232.50 | 13 |
2011-02-06 | Perforation | 227.00 | 228.00 | 13 |
2011-02-06 | Perforation | 615.00 | 615.50 | 13 |
2011-02-06 | Perforation | 252.00 | 253.00 | 13 |
2011-02-06 | Perforation | 646.00 | 647.00 | 13 |
2011-02-06 | Perforation | 637.50 | 639.50 | 13 |
2011-01-21 | Fracture | 460.50 | 462.50 | 0 |
2011-02-06 | Perforation | 345.00 | 346.00 | 13 |
2011-02-06 | Perforation | 591.80 | 592.30 | 13 |
2011-02-06 | Perforation | 566.90 | 567.40 | 13 |
2011-02-06 | Perforation | 573.90 | 575.40 | 13 |
2011-02-06 | Perforation | 558.20 | 559.20 | 13 |
2011-02-06 | Perforation | 546.30 | 546.80 | 13 |
2011-02-06 | Perforation | 552.80 | 553.30 | 13 |
2011-02-06 | Perforation | 590.90 | 591.40 | 13 |
2011-02-06 | Perforation | 589.20 | 590.20 | 13 |
2011-02-06 | Perforation | 318.00 | 318.50 | 13 |
2011-01-21 | Fracture | 386.00 | 388.00 | 0 |
2011-02-13 | Fracture | 361.80 | 575.40 | 0 |
2011-02-13 | Fracture | 324.80 | 325.30 | 0 |
2011-02-13 | Fracture | 589.20 | 615.50 | 0 |
2011-02-13 | Fracture | 227.00 | 253.00 | 0 |
2011-02-13 | Fracture | 345.00 | 346.00 | 0 |
2011-02-13 | Fracture | 637.50 | 647.00 | 0 |
2011-02-06 | Perforation | 482.50 | 483.00 | 13 |
2011-02-06 | Perforation | 483.30 | 483.80 | 13 |
2011-02-06 | Perforation | 468.40 | 469.90 | 13 |
2011-02-06 | Perforation | 474.60 | 475.10 | 13 |
2011-02-06 | Perforation | 488.20 | 489.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7300 | 0.0 | 0.0 | 0.0 |
2012 | 8570 | 0.0 | 0.0 | 0.0 |
2013 | 8609 | 0.0 | 0.0 | 0.0 |
2014 | 8645 | 0.0 | 0.0 | 0.0 |
2015 | 8722 | 0.0 | 0.0 | 0.0 |
2016 | 8684 | 0.0 | 0.0 | 0.0 |
2017 | 8649 | 0.0 | 0.0 | 0.0 |
2018 | 8688 | 0.0 | 0.0 | 0.0 |
2019 | 8485 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[5]