If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284252809000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.424947,"lon":-113.454924,"icon":""}]} |
| Location: 00/09-28-028-25W4/0 | |
| Location Alias: 00/09-28-28-25 W4M | |
| Location Alias 2: 00/09-28-028-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 28 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 9-28-28-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0293870 | |
| License Date: 2003-09-25 | |
| License Status: Issued | |
| Spud Date: 2003-10-03 | |
| Final Drill Date: 2003-10-04 | |
| Well Total Depth: 717.00 m | |
| Surface Hole Latitude: 51.424947 | |
| Surface Hole Longitude: -113.454924 |
| Date | Event |
|---|---|
| 2003-09-25 | Obtained License |
| 2003-10-01 | Conductor Casing Operation Performed |
| 2003-10-04 | Finished Drilling |
| 2003-10-04 | Production Casing Operation Performed |
| 2003-10-04 | Rig Released |
| 2003-10-04 | Well Mode changed to Drilled and Cased |
| 2003-10-11 | Well Log Performed |
| 2003-11-30 | Perforation Treatment Performed - Jet Perforation |
| 2004-01-18 | Perforation Treatment Performed - Fractured |
| 2004-01-22 | Well Fluid changed to Gas |
| 2004-01-22 | Well Mode changed to Testing |
| 2004-05-03 | Well Began Production |
| 2004-05-03 | Well Fluid changed to Gas |
| 2004-05-03 | Well Mode changed to Flowing |
| 2004-11-07 | Perforation Treatment Performed - Jet Perforation |
| 2005-04-06 | Perforation Treatment Performed - Jet Perforation |
| 2005-05-04 | Perforation Treatment Performed - Fractured |
| 2005-05-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2005-05-17 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2003-11-30 | Perforation | 530.00 | 534.00 | 13 |
| 2005-04-06 | Perforation | 572.10 | 572.60 | 13 |
| 2005-04-06 | Perforation | 566.00 | 566.50 | 13 |
| 2005-04-06 | Perforation | 557.30 | 557.80 | 13 |
| 2005-04-06 | Perforation | 549.70 | 550.20 | 13 |
| 2005-04-06 | Perforation | 544.00 | 544.50 | 13 |
| 2005-04-06 | Perforation | 506.60 | 507.10 | 13 |
| 2005-04-06 | Perforation | 492.40 | 492.90 | 13 |
| 2005-04-06 | Perforation | 480.00 | 480.50 | 13 |
| 2005-04-06 | Perforation | 455.00 | 455.50 | 13 |
| 2005-04-06 | Perforation | 446.90 | 447.40 | 13 |
| 2004-01-18 | Fracture | 530.00 | 534.00 | 0 |
| 2005-04-06 | Perforation | 433.40 | 433.90 | 13 |
| 2005-04-06 | Perforation | 432.20 | 432.70 | 13 |
| 2005-04-06 | Perforation | 328.70 | 329.20 | 13 |
| 2005-04-06 | Perforation | 319.40 | 319.90 | 13 |
| 2005-04-06 | Perforation | 253.40 | 253.90 | 13 |
| 2005-04-06 | Perforation | 210.00 | 210.50 | 13 |
| 2005-04-06 | Perforation | 202.90 | 203.40 | 13 |
| 2005-04-06 | Perforation | 200.70 | 201.20 | 13 |
| 2005-04-06 | Perforation | 186.50 | 187.00 | 13 |
| 2005-05-04 | Fracture | 186.50 | 600.70 | 0 |
| 2004-11-07 | Perforation | 503.00 | 504.00 | 14 |
| 2004-11-07 | Perforation | 498.00 | 501.00 | 14 |
| 2005-04-06 | Perforation | 600.20 | 600.70 | 13 |
| 2005-04-06 | Perforation | 598.20 | 598.70 | 13 |
| 2005-04-06 | Perforation | 587.00 | 587.50 | 13 |
| 2005-04-06 | Perforation | 585.80 | 586.30 | 13 |
| 2005-04-06 | Perforation | 574.80 | 575.30 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 5736 | 0.0 | 0.0 | 0.0 |
| 2005 | 7715 | 0.0 | 0.0 | 0.0 |
| 2006 | 8728 | 0.0 | 0.0 | 0.0 |
| 2007 | 8615 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8704 | 0.0 | 0.0 | 0.0 |
| 2011 | 6465 | 0.0 | 0.0 | 0.0 |
| 2012 | 7730 | 0.0 | 0.0 | 0.0 |
| 2013 | 8719 | 0.0 | 0.0 | 0.0 |
| 2014 | 8594 | 0.0 | 0.0 | 0.0 |
| 2015 | 8685 | 0.0 | 0.0 | 0.0 |
| 2016 | 8600 | 0.0 | 0.0 | 0.0 |
| 2017 | 8575 | 0.0 | 0.0 | 0.0 |
| 2018 | 8671 | 0.0 | 0.0 | 0.0 |
| 2019 | 8507 | 0.0 | 0.0 | 0.0 |
| 2020 | 2128 | 0.0 | 0.0 | 0.0 |
For data sources see[5]