X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284253108000

Well Details

Well ID: 0284253108000
Loading map...
Location: 00/08-31-028-25W4/0
Location Alias: 00/08-31-28-25 W4M
Location Alias 2: 00/08-31-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 31
County/Municipality: Rocky View County
Well Name: EMBER SWALWELL 8-31-28-25
Operator Name: Ember Resources Inc.
License Number: 0299893
License Date: 2003-12-23
License Status: Issued
Spud Date: 2004-01-12
Final Drill Date: 2004-01-12
Well Total Depth: 761.00 m
Surface Hole Latitude: 51.437144
Surface Hole Longitude: -113.498364

For data sources see[1][2]

Well History

Date Event
2003-12-23 Obtained License
2004-01-09 Surface Casing Operation Performed
2004-01-12 Finished Drilling
2004-01-12 Production Casing Operation Performed
2004-01-12 Well Mode changed to Drilled and Cased
2004-01-13 Rig Released
2004-02-01 Well Log Performed
2004-02-14 Perforation Treatment Performed - Jet Perforation
2004-08-27 Perforation Treatment Performed - Jet Perforation
2004-09-07 Perforation Treatment Performed - Fractured
2004-09-15 Well Began Production
2004-09-15 Well Fluid changed to Gas
2004-09-15 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-02-14 Perforation 443.00 446.00 13
2004-08-27 Perforation 468.50 469.50 13
2004-08-27 Perforation 482.10 483.10 13
2004-08-27 Perforation 485.40 486.40 13
2004-08-27 Perforation 491.00 492.00 13
2004-08-27 Perforation 511.30 512.30 13
2004-08-27 Perforation 516.90 517.90 13
2004-08-27 Perforation 521.70 522.70 13
2004-08-27 Perforation 530.10 531.10 13
2004-08-27 Perforation 535.90 536.90 13
2004-08-27 Perforation 538.00 539.00 13
2004-08-27 Perforation 214.80 215.80 13
2004-08-27 Perforation 565.80 566.80 13
2004-08-27 Perforation 574.10 575.10 13
2004-08-27 Perforation 579.50 580.50 13
2004-08-27 Perforation 590.90 591.90 13
2004-08-27 Perforation 599.10 600.10 13
2004-08-27 Perforation 605.20 606.20 13
2004-08-27 Perforation 609.60 610.60 13
2004-08-27 Perforation 616.20 617.20 13
2004-08-27 Perforation 631.00 632.00 13
2004-08-27 Perforation 632.90 633.90 13
2004-08-27 Perforation 225.30 226.30 13
2004-08-27 Perforation 635.00 636.00 13
2004-08-27 Perforation 639.20 640.20 13
2004-09-07 Fracture 214.80 640.20 0
2004-08-27 Perforation 234.00 235.00 13
2004-08-27 Perforation 235.30 236.30 13
2004-08-27 Perforation 240.90 241.90 13
2004-08-27 Perforation 245.60 246.60 13
2004-08-27 Perforation 348.70 349.70 13
2004-08-27 Perforation 361.40 362.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 2571 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References