X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284253213002

Well Details

Well ID: 0284253213002
Loading map...
Location: 00/13-32-028-25W4/2
Location Alias: 00/13-32-28-25 W4M
Location Alias 2: 00/13-32-028-25 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 32
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 13-32-28-25
Operator Name: Ember Resources Inc.
License Number: 0325523
License Date: 2005-02-02
License Status: Issued
Spud Date: 2005-05-26
Final Drill Date: 2005-07-05
Well Total Depth: 1028.00 m
Surface Hole Latitude: 51.444703
Surface Hole Longitude: -113.494619

For data sources see[1][2]

Well History

Date Event
2005-02-02 Obtained License
2005-05-27 Surface Casing Operation Performed
2005-07-05 Finished Drilling
2005-07-05 Production Casing Operation Performed
2005-07-05 Rig Released
2005-07-05 Well Mode changed to Drilled and Cased
2005-07-10 Well Log Performed
2005-07-18 Perforation Treatment Performed - Jet Perforation
2005-10-12 Perforation Treatment Performed - Jet Perforation
2005-11-08 Perforation Treatment Performed - Fractured
2005-12-08 Well Began Production
2005-12-08 Well Fluid changed to Coalbed Methane-Coals and Other
2005-12-08 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-18 Perforation 709.00 711.00 13
2005-10-12 Perforation 625.50 626.00 13
2005-10-12 Perforation 618.40 618.90 13
2005-10-12 Perforation 612.60 613.10 13
2005-10-12 Perforation 606.80 607.30 13
2005-10-12 Perforation 598.70 599.20 13
2005-10-12 Perforation 588.70 589.20 13
2005-10-12 Perforation 573.50 574.00 13
2005-10-12 Perforation 572.30 572.80 13
2005-10-12 Perforation 553.80 554.30 13
2005-10-12 Perforation 550.90 551.40 13
2005-10-12 Perforation 945.10 945.60 13
2005-10-12 Perforation 535.80 536.30 13
2005-10-12 Perforation 521.40 521.90 13
2005-10-12 Perforation 516.70 517.20 13
2005-10-12 Perforation 494.40 498.90 13
2005-10-12 Perforation 487.60 488.10 13
2005-10-12 Perforation 486.50 487.00 13
2005-10-12 Perforation 476.80 477.30 13
2005-10-12 Perforation 475.40 475.90 13
2005-10-12 Perforation 374.10 374.60 13
2005-10-12 Perforation 367.10 367.60 13
2005-10-12 Perforation 931.90 932.40 13
2005-10-12 Perforation 357.70 358.20 13
2005-10-12 Perforation 355.50 356.00 13
2005-10-12 Perforation 342.40 342.90 13
2005-10-12 Perforation 292.10 292.60 13
2005-10-12 Perforation 248.80 249.30 13
2005-11-08 Fracture 248.80 945.60 0
2005-10-12 Perforation 901.40 901.90 13
2005-10-12 Perforation 810.90 811.40 13
2005-10-12 Perforation 776.00 776.50 13
2005-10-12 Perforation 643.20 643.70 13
2005-10-12 Perforation 641.80 642.30 13
2005-10-12 Perforation 640.10 640.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 576 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8672 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References