X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284253402003

Well Details

Well ID: 0284253402003
Loading map...
Location: 00/02-34-028-25W4/3
Location Alias: 00/02-34-28-25 W4M
Location Alias 2: 00/02-34-028-25 W4/03
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 34
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 2-34-28-25
Operator Name: Ember Resources Inc.
License Number: 0239345
License Date: 2000-06-29
License Status: Issued
Spud Date: 2000-07-07
Final Drill Date: 2000-12-05
Well Total Depth: 1011.00 m
Surface Hole Latitude: 51.430964
Surface Hole Longitude: -113.434371

For data sources see[1][2]

Well History

Date Event
2000-06-29 Obtained License
2000-07-07 Conductor Casing Operation Performed
2000-12-05 Finished Drilling
2000-12-05 Production Casing Operation Performed
2000-12-05 Rig Released
2000-12-05 Well Mode changed to Drilled and Cased
2000-12-19 Well Log Performed
2001-01-11 Perforation Treatment Performed - Jet Perforation
2001-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-30 Plug Back Performed
2001-12-02 Perforation Treatment Performed - Jet Perforation
2002-02-20 Perforation Treatment Performed - Jet Perforation
2003-03-12 Perforation Treatment Performed - Fractured
2003-07-30 Perforation Treatment Performed - Jet Perforation
2004-01-31 Perforation Treatment Performed - Fractured
2004-02-08 Perforation Treatment Performed - Jet Perforation
2004-05-03 Well Structure changed to Commingled
2007-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-12 Plug Back Performed
2007-02-13 Perforation Treatment Performed - Jet Perforation
2007-02-26 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-11 Perforation 820.00 823.00 7
2004-01-31 Fracture 764.00 769.00 0
2004-02-08 Perforation 451.00 453.00 13
2007-02-12 Packing Device Capped w/Cement 699.00 707.00 0
2007-02-13 Perforation 590.10 591.10 13
2007-02-13 Perforation 588.50 589.00 13
2007-02-13 Perforation 574.60 575.60 13
2007-02-13 Perforation 566.90 567.40 13
2007-02-13 Perforation 560.50 561.50 13
2007-02-13 Perforation 555.80 556.30 13
2007-02-13 Perforation 547.40 548.40 13
2001-01-11 Perforation 825.00 829.00 7
2007-02-13 Perforation 545.80 546.30 13
2007-02-13 Perforation 542.30 542.80 13
2007-02-13 Perforation 524.40 525.40 13
2007-02-13 Perforation 522.40 522.90 13
2007-02-13 Perforation 493.00 493.50 13
2007-02-13 Perforation 485.70 486.20 13
2007-02-13 Perforation 484.40 484.90 13
2007-02-13 Perforation 476.60 477.10 13
2007-02-13 Perforation 471.90 472.90 13
2007-02-13 Perforation 468.10 468.60 13
2001-11-30 Packing Device Capped w/Cement 805.00 813.00 0
2007-02-13 Perforation 447.40 447.90 13
2007-02-13 Perforation 441.00 441.50 13
2007-02-13 Perforation 438.50 439.50 13
2007-02-13 Perforation 432.20 432.70 13
2007-02-13 Perforation 422.90 423.40 13
2007-02-13 Perforation 421.30 422.30 13
2007-02-13 Perforation 364.60 365.10 13
2007-02-13 Perforation 321.00 321.50 13
2007-02-13 Perforation 309.90 310.40 13
2007-02-13 Perforation 205.60 206.10 13
2001-12-02 Perforation 767.00 769.00 7
2007-02-26 Fracture 205.60 591.10 0
2001-12-02 Perforation 764.00 766.00 7
2002-02-20 Perforation 711.50 713.50 7
2003-03-12 Fracture 711.50 713.50 0
2003-07-30 Perforation 657.00 661.00 13
2003-07-30 Perforation 668.00 671.00 13

For data sources see[4]



References