X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284253616000

Well Details

Well ID: 0284253616000
Loading map...
Location: 00/16-36-028-25W4/0
Location Alias: 00/16-36-28-25 W4M
Location Alias 2: 00/16-36-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 36
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 16-36-28-25
Operator Name: Ember Resources Inc.
License Number: 0218434
License Date: 1998-11-03
License Status: Amended
Spud Date: 1998-11-15
Final Drill Date: 1998-11-16
Well Total Depth: 975.00 m
Surface Hole Latitude: 51.443318
Surface Hole Longitude: -113.381137

For data sources see[1][2]

Well History

Date Event
1998-11-03 Obtained License
1998-11-16 Finished Drilling
1998-11-16 Production Casing Operation Performed
1998-11-16 Rig Released
1998-11-16 Well Mode changed to Drilled and Cased
1998-11-26 Well Log Performed
1999-02-02 Perforation Treatment Performed - Jet Perforation
1999-02-24 Perforation Treatment Performed - Fractured
2004-05-26 Perforation Treatment Performed - Jet Perforation
2004-05-29 Perforation Treatment Performed - Fractured
2004-12-04 Well Began Production
2004-12-04 Well Fluid changed to Coalbed Methane-Coals and Other
2004-12-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-02-02 Perforation 849.00 852.00 7
2004-05-26 Perforation 409.80 410.30 13
2004-05-26 Perforation 419.00 419.50 13
2004-05-26 Perforation 426.00 426.50 13
2004-05-26 Perforation 437.00 437.50 13
2004-05-26 Perforation 462.90 463.40 13
2004-05-26 Perforation 466.40 466.90 13
2004-05-26 Perforation 470.70 471.20 13
2004-05-26 Perforation 481.90 482.40 13
2004-05-26 Perforation 483.70 484.20 13
2004-05-26 Perforation 508.40 508.90 13
1999-02-24 Fracture 849.00 852.00 0
2004-05-26 Perforation 512.20 512.70 13
2004-05-26 Perforation 520.90 521.40 13
2004-05-26 Perforation 521.50 522.00 13
2004-05-26 Perforation 525.00 525.50 13
2004-05-26 Perforation 534.00 534.50 13
2004-05-26 Perforation 542.00 542.50 13
2004-05-26 Perforation 547.20 547.70 13
2004-05-26 Perforation 554.90 555.40 13
2004-05-26 Perforation 561.40 561.90 13
2004-05-26 Perforation 579.40 579.90 13
2004-05-26 Perforation 191.20 191.70 13
2004-05-26 Perforation 581.50 582.00 13
2004-05-26 Perforation 582.80 583.30 13
2004-05-29 Fracture 191.20 583.30 0
2004-05-26 Perforation 233.80 234.30 13
2004-05-26 Perforation 282.90 283.40 13
2004-05-26 Perforation 309.40 309.90 13
2004-05-26 Perforation 314.10 314.60 13
2004-05-26 Perforation 408.00 408.50 13
2004-05-26 Perforation 408.90 409.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 24 0.0 0.0 0.0
2004 672 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References