If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284260108002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.364187,"lon":-113.52188,"icon":""}]} |
Location: 00/08-01-028-26W4/2 | |
Location Alias: 00/08-01-28-26 W4M | |
Location Alias 2: 00/08-01-028-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 26 | |
Section: 01 | |
County/Municipality: Rocky View County | |
Well Name: CPC RESOURCES ENTICE 8-1-28-26 | |
Operator Name: Lynx Energy ULC | |
License Number: 0312056 | |
License Date: 2004-07-20 | |
License Status: Issued | |
Spud Date: 2004-07-24 | |
Final Drill Date: 2004-07-26 | |
Well Total Depth: 952.00 m | |
Surface Hole Latitude: 51.364187 | |
Surface Hole Longitude: -113.521880 |
Date | Event |
---|---|
2004-07-20 | Obtained License |
2004-07-24 | Surface Casing Operation Performed |
2004-07-26 | Finished Drilling |
2004-07-26 | Production Casing Operation Performed |
2004-07-26 | Rig Released |
2004-07-26 | Well Mode changed to Drilled and Cased |
2004-08-02 | Well Log Performed |
2004-08-20 | Perforation Treatment Performed - Jet Perforation |
2004-12-05 | Perforation Treatment Performed - Jet Perforation |
2005-02-12 | Perforation Treatment Performed - Jet Perforation |
2005-02-17 | Perforation Treatment Performed - Fractured |
2005-03-26 | Well Began Production |
2005-03-26 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-03-26 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-08-20 | Perforation | 897.50 | 898.50 | 7 |
2005-02-12 | Perforation | 777.80 | 778.80 | 13 |
2005-02-12 | Perforation | 744.90 | 745.90 | 13 |
2005-02-12 | Perforation | 607.90 | 608.90 | 13 |
2005-02-12 | Perforation | 589.80 | 590.80 | 13 |
2005-02-12 | Perforation | 581.70 | 582.70 | 13 |
2005-02-12 | Perforation | 579.10 | 580.10 | 13 |
2005-02-12 | Perforation | 566.50 | 568.50 | 13 |
2005-02-12 | Perforation | 561.50 | 562.50 | 13 |
2005-02-12 | Perforation | 553.60 | 554.60 | 13 |
2005-02-12 | Perforation | 548.30 | 549.30 | 13 |
2004-12-05 | Perforation | 896.80 | 898.80 | 13 |
2005-02-12 | Perforation | 541.00 | 543.00 | 13 |
2005-02-12 | Perforation | 538.50 | 539.50 | 13 |
2005-02-12 | Perforation | 515.30 | 516.30 | 13 |
2005-02-12 | Perforation | 509.70 | 511.70 | 13 |
2005-02-12 | Perforation | 493.40 | 494.40 | 13 |
2005-02-12 | Perforation | 466.00 | 467.00 | 13 |
2005-02-12 | Perforation | 459.20 | 460.20 | 13 |
2005-02-12 | Perforation | 455.40 | 456.40 | 13 |
2005-02-12 | Perforation | 444.00 | 445.00 | 13 |
2005-02-12 | Perforation | 431.40 | 432.40 | 13 |
2004-12-05 | Perforation | 690.00 | 693.00 | 13 |
2005-02-12 | Perforation | 402.50 | 405.50 | 13 |
2005-02-12 | Perforation | 338.50 | 339.50 | 13 |
2005-02-12 | Perforation | 216.60 | 218.60 | 13 |
2005-02-12 | Perforation | 207.40 | 210.40 | 13 |
2005-02-12 | Perforation | 204.00 | 205.00 | 13 |
2005-02-17 | Fracture | 204.00 | 898.80 | 0 |
2004-12-05 | Perforation | 687.00 | 690.00 | 13 |
2005-02-12 | Perforation | 867.00 | 868.00 | 13 |
2005-02-12 | Perforation | 829.20 | 831.20 | 13 |
2005-02-12 | Perforation | 825.10 | 826.10 | 13 |
2005-02-12 | Perforation | 819.20 | 820.20 | 13 |
2005-02-12 | Perforation | 804.70 | 806.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 6508 | 0.0 | 0.0 | 0.0 |
2006 | 8440 | 0.0 | 0.0 | 0.0 |
2007 | 8152 | 0.0 | 0.0 | 0.0 |
2008 | 8735 | 0.0 | 0.0 | 0.0 |
2009 | 8725 | 0.0 | 0.0 | 0.0 |
2010 | 8731 | 0.0 | 0.0 | 0.0 |
2011 | 8632 | 0.0 | 0.0 | 0.0 |
2012 | 8732 | 0.0 | 0.0 | 0.0 |
2013 | 8723 | 0.0 | 0.0 | 0.0 |
2014 | 8604 | 0.0 | 0.0 | 0.0 |
2015 | 8747 | 0.0 | 0.0 | 0.0 |
2016 | 8744 | 0.0 | 0.0 | 0.0 |
2017 | 8647 | 0.0 | 0.0 | 0.0 |
2018 | 8563 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[5]