If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284260910002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.380153,"lon":-113.599493,"icon":""}]} |
Location: 00/10-09-028-26W4/2 | |
Location Alias: 00/10-09-28-26 W4M | |
Location Alias 2: 00/10-09-028-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 26 | |
Section: 09 | |
County/Municipality: Rocky View County | |
Well Name: CPC RESOURCES ENTICE 10-9-28-26 | |
Operator Name: Lynx Energy ULC | |
License Number: 0239841 | |
License Date: 2000-07-18 | |
License Status: Issued | |
Spud Date: 2000-10-17 | |
Final Drill Date: 2000-10-25 | |
Well Total Depth: 1065.00 m | |
Surface Hole Latitude: 51.380153 | |
Surface Hole Longitude: -113.599493 |
Date | Event |
---|---|
2000-07-18 | Obtained License |
2000-10-17 | Conductor Casing Operation Performed |
2000-10-25 | Finished Drilling |
2000-10-25 | Well Log Performed |
2000-10-25 | Well Mode changed to Drilled and Cased |
2000-10-26 | Production Casing Operation Performed |
2000-10-26 | Rig Released |
2000-11-01 | Well Log Performed |
2000-11-03 | Well Log Performed |
2000-11-11 | Perforation Treatment Performed - Jet Perforation |
2000-12-12 | Perforation Treatment Performed - Fractured |
2003-05-23 | Perforation Treatment Performed - Jet Perforation |
2003-05-25 | Perforation Treatment Performed - Jet Perforation |
2003-05-27 | Perforation Treatment Performed - Jet Perforation |
2003-05-31 | Perforation Treatment Performed - Jet Perforation |
2003-06-02 | Perforation Treatment Performed - Jet Perforation |
2003-06-03 | Perforation Treatment Performed - Jet Perforation |
2003-06-04 | Perforation Treatment Performed - Jet Perforation |
2003-06-07 | Perforation Treatment Performed - Fractured |
2011-07-29 | Perforation Treatment Performed - Jet Perforation |
2011-08-01 | Well Began Production |
2011-08-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-08-01 | Well Mode changed to Flowing |
2011-10-11 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-11-11 | Perforation | 729.00 | 732.00 | 7 |
2003-05-31 | Perforation | 424.00 | 428.00 | 7 |
2003-06-02 | Perforation | 400.00 | 404.00 | 7 |
2003-06-02 | Perforation | 384.50 | 386.00 | 7 |
2003-06-03 | Perforation | 335.00 | 337.00 | 7 |
2003-06-03 | Perforation | 233.50 | 236.50 | 7 |
2003-06-04 | Perforation | 213.00 | 215.00 | 7 |
2003-06-07 | Fracture | 213.00 | 692.00 | 0 |
2011-07-29 | Perforation | 266.50 | 268.00 | 13 |
2011-07-29 | Perforation | 480.00 | 481.00 | 13 |
2011-07-29 | Perforation | 482.50 | 483.50 | 13 |
2000-12-12 | Fracture | 729.00 | 732.00 | 0 |
2011-07-29 | Perforation | 487.00 | 488.00 | 13 |
2011-07-29 | Perforation | 497.00 | 498.00 | 13 |
2011-07-29 | Perforation | 499.40 | 500.40 | 13 |
2011-07-29 | Perforation | 502.20 | 503.20 | 13 |
2011-07-29 | Perforation | 508.50 | 509.50 | 13 |
2011-07-29 | Perforation | 533.70 | 534.70 | 13 |
2011-07-29 | Perforation | 581.50 | 584.00 | 13 |
2011-07-29 | Perforation | 589.00 | 590.00 | 13 |
2011-07-29 | Perforation | 611.20 | 612.70 | 13 |
2011-07-29 | Perforation | 619.50 | 620.50 | 13 |
2003-05-23 | Perforation | 690.00 | 692.00 | 7 |
2011-07-29 | Perforation | 624.30 | 625.30 | 13 |
2011-07-29 | Perforation | 627.20 | 628.20 | 13 |
2011-07-29 | Perforation | 637.00 | 638.50 | 13 |
2011-07-29 | Perforation | 652.50 | 653.50 | 13 |
2011-10-11 | Fracture | 480.00 | 653.50 | 0 |
2003-05-25 | Perforation | 594.00 | 595.00 | 7 |
2003-05-27 | Perforation | 566.00 | 567.00 | 7 |
2003-05-27 | Perforation | 559.00 | 561.00 | 7 |
2003-05-27 | Perforation | 545.00 | 547.00 | 7 |
2003-05-27 | Perforation | 526.00 | 528.00 | 7 |
2003-05-31 | Perforation | 443.00 | 446.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3199 | 0.0 | 0.0 | 0.0 |
2012 | 8732 | 0.0 | 0.0 | 0.0 |
2013 | 8723 | 0.0 | 0.0 | 0.0 |
2014 | 8604 | 0.0 | 0.0 | 0.0 |
2015 | 8747 | 0.0 | 0.0 | 0.0 |
2016 | 8744 | 0.0 | 0.0 | 0.0 |
2017 | 8647 | 0.0 | 0.0 | 0.0 |
2018 | 8563 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2011-10-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]