If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284263506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.437482,"lon":-113.556993,"icon":""}]} |
| Location: 00/06-35-028-26W4/0 | |
| Location Alias: 00/06-35-28-26 W4M | |
| Location Alias 2: 00/06-35-028-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 35 | |
| County/Municipality: Rocky View County | |
| Well Name: CPC RESOURCES ENTICE 6-35-28-26 | |
| Operator Name: Lynx Energy ULC | |
| License Number: 0313005 | |
| License Date: 2004-08-09 | |
| License Status: Issued | |
| Spud Date: 2004-08-21 | |
| Final Drill Date: 2004-08-22 | |
| Well Total Depth: 760.00 m | |
| Surface Hole Latitude: 51.437482 | |
| Surface Hole Longitude: -113.556993 |
| Date | Event |
|---|---|
| 2004-08-09 | Obtained License |
| 2004-08-17 | Surface Casing Operation Performed |
| 2004-08-22 | Finished Drilling |
| 2004-08-22 | Production Casing Operation Performed |
| 2004-08-22 | Rig Released |
| 2004-08-22 | Well Mode changed to Drilled and Cased |
| 2004-08-30 | Well Log Performed |
| 2004-09-09 | Perforation Treatment Performed - Jet Perforation |
| 2004-09-12 | Perforation Treatment Performed - Fractured |
| 2004-09-24 | Well Began Production |
| 2004-09-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2004-09-24 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-09-09 | Perforation | 661.00 | 662.00 | 7 |
| 2004-09-09 | Perforation | 593.00 | 595.00 | 7 |
| 2004-09-09 | Perforation | 575.00 | 576.00 | 7 |
| 2004-09-09 | Perforation | 573.00 | 574.00 | 7 |
| 2004-09-09 | Perforation | 566.50 | 568.50 | 7 |
| 2004-09-09 | Perforation | 558.50 | 559.50 | 7 |
| 2004-09-09 | Perforation | 540.00 | 541.00 | 7 |
| 2004-09-09 | Perforation | 534.00 | 535.00 | 7 |
| 2004-09-09 | Perforation | 516.30 | 517.30 | 7 |
| 2004-09-09 | Perforation | 507.00 | 508.00 | 7 |
| 2004-09-09 | Perforation | 504.50 | 505.50 | 7 |
| 2004-09-09 | Perforation | 657.20 | 658.20 | 7 |
| 2004-09-09 | Perforation | 489.00 | 492.00 | 7 |
| 2004-09-09 | Perforation | 434.50 | 436.50 | 7 |
| 2004-09-09 | Perforation | 419.00 | 421.00 | 7 |
| 2004-09-09 | Perforation | 384.00 | 385.00 | 7 |
| 2004-09-09 | Perforation | 364.00 | 365.00 | 7 |
| 2004-09-09 | Perforation | 361.00 | 362.00 | 7 |
| 2004-09-09 | Perforation | 352.00 | 354.00 | 7 |
| 2004-09-09 | Perforation | 321.00 | 323.00 | 7 |
| 2004-09-09 | Perforation | 306.00 | 307.00 | 7 |
| 2004-09-09 | Perforation | 301.00 | 302.00 | 7 |
| 2004-09-09 | Perforation | 647.50 | 650.50 | 7 |
| 2004-09-09 | Perforation | 268.00 | 269.00 | 7 |
| 2004-09-09 | Perforation | 250.00 | 252.00 | 7 |
| 2004-09-09 | Perforation | 243.30 | 245.30 | 7 |
| 2004-09-09 | Perforation | 228.50 | 229.50 | 7 |
| 2004-09-09 | Perforation | 210.00 | 211.00 | 7 |
| 2004-09-12 | Fracture | 210.00 | 658.00 | 0 |
| 2004-09-09 | Perforation | 639.50 | 641.50 | 7 |
| 2004-09-09 | Perforation | 629.00 | 630.00 | 7 |
| 2004-09-09 | Perforation | 620.00 | 622.00 | 7 |
| 2004-09-09 | Perforation | 607.80 | 608.80 | 7 |
| 2004-09-09 | Perforation | 603.00 | 604.00 | 7 |
| 2004-09-09 | Perforation | 595.00 | 597.00 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 2376 | 0.0 | 0.0 | 0.0 |
| 2005 | 8749 | 0.0 | 0.0 | 0.0 |
| 2006 | 8753 | 0.0 | 0.0 | 0.0 |
| 2007 | 8748 | 0.0 | 0.0 | 0.0 |
| 2008 | 8735 | 0.0 | 0.0 | 0.0 |
| 2009 | 8653 | 0.0 | 0.0 | 0.0 |
| 2010 | 8731 | 0.0 | 0.0 | 0.0 |
| 2011 | 8632 | 0.0 | 0.0 | 0.0 |
| 2012 | 8732 | 0.0 | 0.0 | 0.0 |
| 2013 | 8723 | 0.0 | 0.0 | 0.0 |
| 2014 | 8604 | 0.0 | 0.0 | 0.0 |
| 2015 | 8747 | 0.0 | 0.0 | 0.0 |
| 2016 | 8744 | 0.0 | 0.0 | 0.0 |
| 2017 | 8648 | 0.0 | 0.0 | 0.0 |
| 2018 | 8563 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[5]