If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284271613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.398733,"lon":-113.750362,"icon":""}]} |
Location: 00/13-16-028-27W4/0 | |
Location Alias: 00/13-16-28-27 W4M | |
Location Alias 2: 00/13-16-028-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 27 | |
Section: 16 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 13-16-28-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0351655 | |
License Date: 2006-02-09 | |
License Status: Issued | |
Spud Date: 2006-02-25 | |
Final Drill Date: 2006-02-28 | |
Well Total Depth: 1172.00 m | |
Surface Hole Latitude: 51.398733 | |
Surface Hole Longitude: -113.750362 |
Date | Event |
---|---|
2006-02-09 | Obtained License |
2006-02-25 | Surface Casing Operation Performed |
2006-02-28 | Finished Drilling |
2006-02-28 | Production Casing Operation Performed |
2006-02-28 | Rig Released |
2006-02-28 | Well Mode changed to Drilled and Cased |
2006-03-06 | Well Log Performed |
2006-09-21 | Perforation Treatment Performed - Jet Perforation |
2006-09-27 | Perforation Treatment Performed - Fractured |
2006-10-12 | Well Began Production |
2006-10-12 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-10-12 | Well Mode changed to Flowing |
2010-07-11 | Perforation Treatment Performed - Jet Perforation |
2010-07-30 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-09-21 | Perforation | 792.30 | 792.80 | 13 |
2006-09-21 | Perforation | 709.90 | 710.40 | 13 |
2006-09-21 | Perforation | 693.30 | 693.80 | 13 |
2006-09-21 | Perforation | 681.60 | 682.10 | 13 |
2006-09-21 | Perforation | 625.60 | 626.10 | 13 |
2006-09-21 | Perforation | 611.60 | 612.10 | 13 |
2006-09-21 | Perforation | 608.70 | 609.20 | 13 |
2006-09-21 | Perforation | 486.10 | 486.60 | 13 |
2006-09-21 | Perforation | 480.70 | 481.20 | 13 |
2006-09-21 | Perforation | 420.20 | 420.70 | 13 |
2006-09-21 | Perforation | 356.30 | 356.80 | 13 |
2006-09-21 | Perforation | 784.60 | 785.10 | 13 |
2006-09-27 | Fracture | 356.30 | 792.80 | 0 |
2010-07-11 | Perforation | 1107.00 | 1109.00 | 13 |
2010-07-11 | Perforation | 1075.00 | 1077.00 | 13 |
2010-07-11 | Perforation | 1043.00 | 1045.00 | 13 |
2010-07-11 | Perforation | 1010.00 | 1012.00 | 13 |
2010-07-11 | Perforation | 787.00 | 789.00 | 13 |
2010-07-11 | Perforation | 735.00 | 738.00 | 13 |
2010-07-11 | Perforation | 689.00 | 690.00 | 13 |
2010-07-11 | Perforation | 631.00 | 632.00 | 13 |
2010-07-11 | Perforation | 620.00 | 622.00 | 13 |
2006-09-21 | Perforation | 774.00 | 775.00 | 13 |
2010-07-11 | Perforation | 614.00 | 617.00 | 13 |
2010-07-11 | Perforation | 583.00 | 584.00 | 13 |
2010-07-11 | Perforation | 579.00 | 580.00 | 13 |
2010-07-11 | Perforation | 560.00 | 563.00 | 13 |
2010-07-11 | Perforation | 516.00 | 517.00 | 13 |
2010-07-11 | Perforation | 503.00 | 505.00 | 13 |
2010-07-11 | Perforation | 494.00 | 495.00 | 13 |
2010-07-11 | Perforation | 488.00 | 490.00 | 13 |
2010-07-11 | Perforation | 432.00 | 434.00 | 13 |
2010-07-11 | Perforation | 427.00 | 430.00 | 13 |
2006-09-21 | Perforation | 754.90 | 755.40 | 13 |
2010-07-11 | Perforation | 414.00 | 417.00 | 13 |
2010-07-11 | Perforation | 377.00 | 380.00 | 13 |
2006-09-21 | Perforation | 750.20 | 750.70 | 13 |
2006-09-21 | Perforation | 745.70 | 747.70 | 13 |
2006-09-21 | Perforation | 723.90 | 724.40 | 13 |
2006-09-21 | Perforation | 718.30 | 718.80 | 13 |
2006-09-21 | Perforation | 711.00 | 711.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1851 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 5071 | 0.0 | 0.0 | 0.0 |
For data sources see[5]