If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284281008000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.38771,"lon":-113.86541,"icon":""}]} |
| Location: 00/08-10-028-28W4/0 | |
| Location Alias: 00/08-10-28-28 W4M | |
| Location Alias 2: 00/08-10-028-28 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 28 | |
| Section: 10 | |
| County/Municipality: Rocky View County | |
| Well Name: HARVEST HZ CROSSE 8-10-28-28 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0419230 | |
| License Date: 2010-03-11 | |
| License Status: Suspension | |
| Spud Date: 2011-02-16 | |
| Final Drill Date: 2011-03-20 | |
| Well Total Depth: 3202.00 m | |
| Surface Hole Latitude: 51.387710 | |
| Surface Hole Longitude: -113.865410 |
| Date | Event |
|---|---|
| 2010-03-11 | Obtained License |
| 2011-02-18 | Surface Casing Operation Performed |
| 2011-02-22 | Direction Drilling Operation Performed - Horizontal |
| 2011-02-22 | Well Log Performed |
| 2011-02-25 | Well Log Performed |
| 2011-03-16 | Well Log Performed |
| 2011-03-20 | Finished Drilling |
| 2011-03-20 | Well Log Performed |
| 2011-03-20 | Well Mode changed to Drilled and Cased |
| 2011-03-22 | Production Casing Operation Performed |
| 2011-03-23 | Rig Released |
| 2011-04-18 | Perforation Treatment Performed - Jet Perforation |
| 2011-04-19 | Perforation Treatment Performed - Fractured |
| 2011-04-20 | Perforation Treatment Performed - Fractured |
| 2011-04-20 | Perforation Treatment Performed - Jet Perforation |
| 2011-04-21 | Perforation Treatment Performed - Fractured |
| 2011-04-23 | Perforation Treatment Performed - Jet Perforation |
| 2011-04-24 | Perforation Treatment Performed - Fractured |
| 2011-07-06 | Well Log Performed |
| 2011-10-10 | Well Began Production |
| 2011-10-10 | Well Fluid changed to Gas |
| 2011-10-10 | Well Mode changed to Pumping |
| 2014-12-03 | Well Fluid changed to Gas |
| 2014-12-03 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-02-22 | 1855.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-04-18 | Perforation | 3182.00 | 3183.00 | 7 |
| 2011-04-20 | Fracture | 2820.00 | 2821.00 | 0 |
| 2011-04-20 | Fracture | 2817.80 | 2818.80 | 0 |
| 2011-04-20 | Fracture | 2815.60 | 2816.60 | 0 |
| 2011-04-20 | Perforation | 2695.00 | 2696.00 | 7 |
| 2011-04-20 | Perforation | 2595.00 | 2596.00 | 7 |
| 2011-04-20 | Perforation | 2470.00 | 2471.00 | 7 |
| 2011-04-21 | Fracture | 2695.00 | 2696.00 | 0 |
| 2011-04-21 | Fracture | 2595.00 | 2596.00 | 0 |
| 2011-04-21 | Fracture | 2470.00 | 2471.00 | 0 |
| 2011-04-23 | Perforation | 2345.00 | 2346.00 | 7 |
| 2011-04-18 | Perforation | 3070.00 | 3071.00 | 7 |
| 2011-04-23 | Perforation | 2220.00 | 2221.00 | 7 |
| 2011-04-24 | Fracture | 2345.00 | 2346.00 | 0 |
| 2011-04-24 | Fracture | 2220.00 | 2221.00 | 0 |
| 2011-04-18 | Perforation | 2945.00 | 2946.00 | 7 |
| 2011-04-19 | Fracture | 3182.00 | 3183.00 | 0 |
| 2011-04-19 | Fracture | 3070.00 | 3071.00 | 0 |
| 2011-04-19 | Fracture | 2945.00 | 2946.00 | 0 |
| 2011-04-20 | Perforation | 2820.00 | 2821.00 | 7 |
| 2011-04-20 | Perforation | 2817.80 | 2818.80 | 7 |
| 2011-04-20 | Perforation | 2815.60 | 2816.60 | 7 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 1920 | 0.0 | 0.0 | 0.0 |
| 2012 | 5645 | 0.0 | 0.0 | 0.0 |
| 2013 | 3024 | 0.0 | 0.0 | 0.0 |
For data sources see[6]