If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284281105000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.375081,"lon":-113.840832,"icon":""}]} |
| Location: 00/05-11-028-28W4/0 | |
| Location Alias: 00/05-11-28-28 W4M | |
| Location Alias 2: 00/05-11-028-28 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 28 | |
| Section: 11 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER CROSSE 5-11-28-28 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0438268 | |
| License Date: 2011-11-01 | |
| License Status: Issued | |
| Spud Date: 2012-01-03 | |
| Final Drill Date: 2012-01-04 | |
| Well Total Depth: 1326.00 m | |
| Surface Hole Latitude: 51.375081 | |
| Surface Hole Longitude: -113.840832 |
| Date | Event |
|---|---|
| 2011-11-01 | Obtained License |
| 2012-01-03 | Direction Drilling Operation Performed - Deviate |
| 2012-01-03 | Surface Casing Operation Performed |
| 2012-01-04 | Finished Drilling |
| 2012-01-04 | Well Mode changed to Drilled and Cased |
| 2012-01-05 | Production Casing Operation Performed |
| 2012-01-05 | Rig Released |
| 2012-01-10 | Well Log Performed |
| 2012-01-20 | Perforation Treatment Performed - Jet Perforation |
| 2012-01-21 | Perforation Treatment Performed - Jet Perforation |
| 2012-01-27 | Perforation Treatment Performed - Fractured |
| 2012-01-28 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2012-01-28 | Well Mode changed to Testing |
| 2012-06-03 | Well Began Production |
| 2012-06-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2012-06-03 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-01-03 | Precision Drilling Corporation | 239 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-01-03 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-01-20 | Perforation | 707.50 | 710.00 | 13 |
| 2012-01-20 | Perforation | 903.60 | 905.10 | 13 |
| 2012-01-20 | Perforation | 912.90 | 913.40 | 13 |
| 2012-01-20 | Perforation | 918.20 | 918.70 | 13 |
| 2012-01-20 | Perforation | 935.50 | 936.50 | 13 |
| 2012-01-20 | Perforation | 937.80 | 939.30 | 13 |
| 2012-01-20 | Perforation | 955.50 | 956.00 | 13 |
| 2012-01-20 | Perforation | 959.00 | 960.00 | 13 |
| 2012-01-20 | Perforation | 984.70 | 985.20 | 13 |
| 2012-01-21 | Perforation | 529.30 | 530.30 | 13 |
| 2012-01-21 | Perforation | 537.20 | 537.70 | 13 |
| 2012-01-20 | Perforation | 736.00 | 736.50 | 13 |
| 2012-01-21 | Perforation | 539.60 | 540.10 | 13 |
| 2012-01-21 | Perforation | 544.50 | 545.00 | 13 |
| 2012-01-21 | Perforation | 556.60 | 558.10 | 13 |
| 2012-01-21 | Perforation | 660.40 | 660.90 | 13 |
| 2012-01-21 | Perforation | 664.10 | 664.60 | 13 |
| 2012-01-21 | Perforation | 669.20 | 669.70 | 13 |
| 2012-01-21 | Perforation | 686.00 | 686.50 | 13 |
| 2012-01-21 | Perforation | 690.70 | 691.20 | 13 |
| 2012-01-21 | Perforation | 695.00 | 698.00 | 13 |
| 2012-01-27 | Fracture | 529.30 | 985.20 | 0 |
| 2012-01-20 | Perforation | 802.60 | 803.10 | 13 |
| 2012-01-20 | Perforation | 804.50 | 805.00 | 13 |
| 2012-01-20 | Perforation | 811.40 | 812.40 | 13 |
| 2012-01-20 | Perforation | 814.70 | 815.20 | 13 |
| 2012-01-20 | Perforation | 833.00 | 836.00 | 13 |
| 2012-01-20 | Perforation | 876.00 | 876.50 | 13 |
| 2012-01-20 | Perforation | 886.00 | 887.00 | 13 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 5088 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8717 | 0.0 | 0.0 | 0.0 |
| 2015 | 8742 | 0.0 | 0.0 | 0.0 |
| 2016 | 8663 | 0.0 | 0.0 | 0.0 |
| 2017 | 8692 | 0.0 | 0.0 | 0.0 |
| 2018 | 8284 | 0.0 | 0.0 | 0.0 |
| 2019 | 8600 | 0.0 | 0.0 | 0.0 |
| 2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[7]