X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284281105000

Well Details

Well ID: 0284281105000
Loading map...
Location: 00/05-11-028-28W4/0
Location Alias: 00/05-11-28-28 W4M
Location Alias 2: 00/05-11-028-28 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 28
Section: 11
County/Municipality: Rocky View County
Well Name: EMBER CROSSE 5-11-28-28
Operator Name: Ember Resources Inc.
License Number: 0438268
License Date: 2011-11-01
License Status: Issued
Spud Date: 2012-01-03
Final Drill Date: 2012-01-04
Well Total Depth: 1326.00 m
Surface Hole Latitude: 51.375081
Surface Hole Longitude: -113.840832

For data sources see[1][2]

Well History

Date Event
2011-11-01 Obtained License
2012-01-03 Direction Drilling Operation Performed - Deviate
2012-01-03 Surface Casing Operation Performed
2012-01-04 Finished Drilling
2012-01-04 Well Mode changed to Drilled and Cased
2012-01-05 Production Casing Operation Performed
2012-01-05 Rig Released
2012-01-10 Well Log Performed
2012-01-20 Perforation Treatment Performed - Jet Perforation
2012-01-21 Perforation Treatment Performed - Jet Perforation
2012-01-27 Perforation Treatment Performed - Fractured
2012-01-28 Well Fluid changed to Coalbed Methane-Coals and Other
2012-01-28 Well Mode changed to Testing
2012-06-03 Well Began Production
2012-06-03 Well Fluid changed to Coalbed Methane-Coals and Other
2012-06-03 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-03 Precision Drilling Corporation 239 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-03 0.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-20 Perforation 707.50 710.00 13
2012-01-20 Perforation 903.60 905.10 13
2012-01-20 Perforation 912.90 913.40 13
2012-01-20 Perforation 918.20 918.70 13
2012-01-20 Perforation 935.50 936.50 13
2012-01-20 Perforation 937.80 939.30 13
2012-01-20 Perforation 955.50 956.00 13
2012-01-20 Perforation 959.00 960.00 13
2012-01-20 Perforation 984.70 985.20 13
2012-01-21 Perforation 529.30 530.30 13
2012-01-21 Perforation 537.20 537.70 13
2012-01-20 Perforation 736.00 736.50 13
2012-01-21 Perforation 539.60 540.10 13
2012-01-21 Perforation 544.50 545.00 13
2012-01-21 Perforation 556.60 558.10 13
2012-01-21 Perforation 660.40 660.90 13
2012-01-21 Perforation 664.10 664.60 13
2012-01-21 Perforation 669.20 669.70 13
2012-01-21 Perforation 686.00 686.50 13
2012-01-21 Perforation 690.70 691.20 13
2012-01-21 Perforation 695.00 698.00 13
2012-01-27 Fracture 529.30 985.20 0
2012-01-20 Perforation 802.60 803.10 13
2012-01-20 Perforation 804.50 805.00 13
2012-01-20 Perforation 811.40 812.40 13
2012-01-20 Perforation 814.70 815.20 13
2012-01-20 Perforation 833.00 836.00 13
2012-01-20 Perforation 876.00 876.50 13
2012-01-20 Perforation 886.00 887.00 13

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5088 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8692 0.0 0.0 0.0
2018 8284 0.0 0.0 0.0
2019 8600 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[7]

References